Browse
Search
Agenda - 05-20-2014 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 05-20-2014 - Regular Mtg.
>
Agenda - 05-20-2014 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 2:13:04 PM
Creation date
5/16/2014 12:30:28 PM
Metadata
Fields
Template:
BOCC
Date
5/20/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 05-20-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
ORD-2014-022 Comprehensive Plan and Unified Development Ordinance Text Amendments for Agricultural Support Enterprises Outside of the Rural Buffer Land Use Classification - Public Hearing Closure and Action
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5• Uses 66 <br />Section 5 14 Standards for Manufacturing, Assembly & Processing8F <br />(b) An analysis of the amount of groundwater withdrawal considered to be <br />safe and sustainable in the immediate vicinity, and <br />(c) An analysis of whether other wells in the vicinity of the proposed use w+4 <br />are expected to be affected by withdrawals made by the proposed use <br />5.14.3 Sawmills <br />(A) General Standards for Evaluation and ASE -CZ Zoning District <br />(1) Minimum lot size 5 acres <br />(2) All structures, equipment, and storage shall be located a minimum of 100 feet <br />from the property line <br />(3) Hours of operation shall be limited to the hours between 7 a m and 7 p m <br />(4) Site shall have direct access to a major road, as classified in the Orange County <br />Comprehensive Plan, and shall use said road as the primary access, unless <br />approved otherwise in the permit <br />5 14 4 Winery, production only <br />(A) Standards for Class B Special Use Permit or ASE -CZ Zoning District <br />(1) If located in an AR zoning district, the winery must be located on a bona fide <br />farm <br />(a) A winery, production only, that is located on a bona fide farm, and which <br />utilizes primarily crops produced on -site is considered a bona fide <br />farming use and is not subject to zoning regulations <br />(b) A winery, production only, that does not utilize primarily crops produced <br />on -site, regardless of whether it is located on a bona fide farm, is not <br />considered a bona fide farming use and is subject to the regulations <br />contained in this Ordinance <br />(2) If located adjacent to residentially zoned property, all buildings shall be located a <br />minimum of 100 feet from the property line <br />(3) Application materials shall include a comprehensive groundwater study, for <br />facilities expected to use more thaa240 galle s s# groundwater per day peF aG-re <br />of let area on an annual basis than an average single family residence (which <br />uses 240 gallons of water per day) built at the highest density the existing zoning <br />district would allow For example, if the existing zoning district allows a <br />residential density of 1 unit for 2 acres and the proposed use is on a six acre <br />parcel (which could yield 3 residences), the proposed use(s) may use three times <br />the water used by an average single family residence (or 720 gallons per day, on <br />an annualized basis) before a comprehensive groundwater study is required <br />The water usage rates of any existing use subject to zoning regulations located <br />on the same lot shall be taken into account when determining if a comprehensive <br />groundwater study is required Said study shall detail. <br />(1) The amount of water anticipated to be used on a daily, weekly, <br />monthly, and annual basis by regulated uses located on the <br />parcel (e g., water usage by bona fide farm uses is not required <br />to be included); <br />(ii) An analysis of the amount of groundwater withdrawal considered <br />to be safe and sustainable in the immediate vicinity, and <br />(iii) An analysis of whether other wells in the vicinity of the proposed <br />use wi 4 are expected to be affected by withdrawals made by the <br />proposed use <br />Orange County, North Carolina — Unified Development Ordinance Page 5 -131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.