Orange County NC Website
Article 5. Uses 63 <br />Section 5 13 Standards for Agricultural Uses <br />(c) An analysis of whether other wells in the vicinity of the proposed use w+4 <br />are expected to be affected by withdrawals made by the proposed use <br />513.15 Non -Farm Use of Farm Equipment <br />(A) General Standards for Evaluation <br />(1) Use shall he IGGated a a bona fide farm 31 <br />(2) 32 Equipment shall be screened from view from adjacent properties and road(s) <br />(3) Outdoor storage of materials such as gravel, dirt, or plants shall be limited in both <br />area and duration <br />(4) On -site retail sales shall not be permitted <br />5.13.16 Riding Stables, Commercial33 <br />(A) Standards for Class B Special Use Permit or ASE -CZ or MPD -CZ Zoning Districts <br />(1) Submittal Requirements— <br />In addition to the information required by Sections 2 7 or 2 9, as applicable, the <br />following information shall be supplied as part of the application for approval of <br />this use <br />(a) Plans for all barns, boarding facilities, exercise yards, riding arenas, and <br />related improvements, including signage <br />(b) Site plan showing the improvements listed in a) above, other structures <br />on the same lot, and structures on adjacent property <br />(c) A comprehensive groundwater study, for facilities expected to use more <br />th ^n 240 galleRs of groundwater per day per ^ ^f let area on an <br />annual basis than an average single family residence (which uses 240 <br />gallons of water per day) built at the highest density the existing zoning <br />district would allow For example, if the existing zoning district allows a <br />residential density of 1 unit for 2 acres and the proposed use is on a six <br />acre parcel (which could yield 3 residences), the proposed use(s) may <br />use three times the water used by an average single family residence (or <br />720 gallons per day, on an annualized basis) before a comprehensive <br />groundwater study is required The water usage rates of any existing <br />use subject to zoning regulations located on the same lot shall be taken <br />into account when determining if a comprehensive groundwater study is <br />required Said study shall detail <br />(1) The amount of water anticipated to be used on a daily, weekly, <br />monthly, and annual basis by regulated uses located on the <br />parcel (e g , water usage by bona fide farm uses is not required <br />to be included), <br />(u) An analysis of the amount of groundwater withdrawal considered <br />to be safe and sustainable in the immediate vicinity, and <br />(iii) An analysis of whether other wells in the vicinity of the proposed <br />use w+4 are expected to be affected by withdrawals made by the <br />proposed use <br />31 The County Attorney's office has advised that this standard is legally insufficient and must be removed Removal <br />of this standard means that farm equipment could be stored, subject to standards, on parcels that are not <br />considered bona fide farms. <br />32 Renumbering will occur automatically after (1) is removed. <br />33 Language shown in black text (existing) is proposed to be moved from existing Section 5 6 6 <br />Orange County, North Carolina — Unified Development Ordinance Page 5 -128 <br />