Browse
Search
Agenda - 05-20-2014 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 05-20-2014 - Regular Mtg.
>
Agenda - 05-20-2014 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 2:13:04 PM
Creation date
5/16/2014 12:30:28 PM
Metadata
Fields
Template:
BOCC
Date
5/20/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 05-20-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
ORD-2014-022 Comprehensive Plan and Unified Development Ordinance Text Amendments for Agricultural Support Enterprises Outside of the Rural Buffer Land Use Classification - Public Hearing Closure and Action
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5. Uses ,,q <br />Section 5 13 Standards for Agncultural Uses <br />(8) Application materials shall include a comprehensive groundwater study, for <br />facilities expected to use more than 240 galle of groundwater peF day per aGFe <br />of let ;re;; on an annual basis than an average single family residence (which <br />uses 240 gallons of water per day) built at the highest density the existing zoning <br />district would allow For example, if the existing zoning district allows a <br />residential density of 1 unit for 2 acres and the proposed use is on a six acre <br />parcel (which could yield 3 residences), the proposed use(s) may use three times <br />the water used by an average single family residence (or 720 gallons per day, on <br />an annualized basis) before a comprehensive groundwater study is required <br />The water usage rates of any existing use subject to zoning regulations located <br />on the same lot shall be taken into account when determining if a comprehensive <br />groundwater study is required Said study shall detail. <br />(a) The amount of water anticipated to be used on a daily, weekly, monthly, <br />and annual basis by regulated uses located on the parcel (e g , water <br />usage by bona fide farm uses is not required to be included); <br />(b) An analysis of the amount of groundwater withdrawal considered to be <br />safe and sustainable in the immediate vicinity, and <br />(c) An analysis of whether other wells in the vicinity of the proposed use w+ll <br />are expected to be affected by withdrawals made by the proposed use <br />5 13.7 Cooperative Farm Stand <br />(A) General Standards for Evaluation <br />(2) 28 In addition to the application materials required in Sections 2 5 2 and 2 4 3, the <br />following shall also be required. <br />(a) The number of and location of participating cooperative farm partners. <br />(b) A description of the facility, including size of structure(s) and access <br />locations <br />(c) Number of employees, if any <br />(d) Frequency and hours of operation <br />(3) Sales of any products not produced on the farm(s) of one of the cooperative farm <br />partners shall be incidental, related to, and a subordinate component of farm <br />stand sales in scale and profit <br />5.13.8 Equestrian Center <br />(A) Standards for Class A Special Use Permit or ASE -CZ Zoning District <br />(1) Minimum lot size 15 acres. <br />(2) Site shall have direct access to a mayor road, as classified in the Orange County <br />Comprehensive Plan, and shall use said road as the primary access, unless <br />approved otherwise in the permit <br />(3) All structures, facilities, storage areas, and parking areas shall be setback a <br />minimum of 100 feet from all property lines <br />Z' The County Attorney's office has advised that this standard is legally insufficient and must be removed Removal <br />of this standard means that within the AR zoning district, a cooperative farm stand can be located, subject to <br />standards, on parcels that are not considered bona fide farms <br />28 Renumbering will automatically occur after (1) is removed <br />Orange County, North Carolina — Unified Development Ordinance Page 5 -123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.