Browse
Search
Agenda - 05-20-2014 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 05-20-2014 - Regular Mtg.
>
Agenda - 05-20-2014 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 2:13:04 PM
Creation date
5/16/2014 12:30:28 PM
Metadata
Fields
Template:
BOCC
Date
5/20/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 05-20-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
ORD-2014-022 Comprehensive Plan and Unified Development Ordinance Text Amendments for Agricultural Support Enterprises Outside of the Rural Buffer Land Use Classification - Public Hearing Closure and Action
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5 Uses 55 <br />Section 5 13 Standards for Agricultural Uses <br />k) The Operations Plan and the Rehabilitation Plan shall be coordinated/10 <br />that the amount of disturbed land is kept to the absolute minimum <br />consonant with good practices and so that rehabilitation procee in <br />concert with extraction <br />(1) N and disturbance shall take place within 250 feet of the oning lot line <br />or th roperty line where the zoning line and the prope line are one <br />and the ame Within the 250 foot setback area, exis g vegetation <br />shall be r fined for the purpose of providing a vis screen and noise <br />buffer No ' turbance or removal of vegetation all be permitted <br />except for acc s roads leading from the exca tion area to public <br />roads Where ve tation within the 250 foot etback does not exist, the <br />applicant shall be re wired to provide a d se, evergreen buffer <br />consistent with the pur ose cited abov The buffer shall be in place <br />prior to the initiation of a excavatio activities <br />(m) The applicant shall submit o ra nal reports, prepared on an annual <br />basis, detailing the amounts of aterials extracted, extent of extractive <br />area, depth of extractive are , an esults of groundwater test borings. <br />(n) Annual inspections of th operation s II be conducted by the Planning <br />Director following sub ittal of the annua operations reports to determine <br />compliance with th rovisions of the Spec I Use Permit <br />(o) In cases of aba onment or termination of op tions for a period of 12 <br />consecutive onths, application for a new Speci Use Permit is <br />required <br />(p) The Bo rd of County Commissioners shall require for a extractive uses <br />a pe rmance guarantee to insure that the provisions of t <br />R abilitation Plan are met Such performance guarantee s II be in a <br />rm approved by the County Attorney The amount of such g rantee <br />shall cover the cost of rehabilitation on a per acre basis, if the co does <br />not exceed the amount posted with the State If the rehabilitation c t <br />exceeds the amounts required by the State then the difference shall b <br />made up in a bond to Orange County <br />(SECTION 5.13: STANDARDS FOR AGRICULTURAL USES <br />5.13 .1 G al Feeder OperatjG. 26 <br />(A) General Standards <br />26 This is a bona fide agricultural use and cannot be regulated by zoning so staff is suggesting it be removed from <br />the UDO <br />Orange County, North Carolina — Unified Development Ordinance Page 5 -120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.