Orange County NC Website
HOBBS, UPCHURCH & ASSOCIATES, P.A. <br />Consulting Engineers <br />Southern Pines, NC <br />22-Apr-14 <br />Buckhom- Mebane EDD Sewer Improvements <br />Orange County, NC <br />Phase 2 - West Ten Road Pump Station <br />Opinion of Probable Costs <br />36 <br />20" Steel casing installed on grade crossing Rail line <br />for the proposed 8 -inch gravity sewer <br />295 <br />LF <br />$600.00 <br />$177,000.00 <br />37 <br />24" Steel casing installed on grade crossing 1-40 / 85 <br />for the proposed 12 -inch gravity sewer <br />330 <br />LF <br />$750.00 <br />$247,500.00 <br />38 <br />4'0" Diameter Manhole 6' -8' <br />7 <br />EA <br />$2,000.00 <br />$14,000.00 <br />39 <br />4' 0" Diameter Manhole 8' -10' <br />S <br />EA <br />$2,200.00 <br />$11,000.00 <br />40 <br />4'0" Diameter Manhole 10' -12' <br />2 <br />EA <br />$2,550. 0 <br />$5,100.00 <br />41 <br />4'0" Diameter Manhole 12' -14' <br />1 <br />EA <br />$3,000.00 <br />$3,000.00 <br />42 <br />4'0" Diameter Manhole 14' -16' <br />2 <br />EA <br />$3,350.00 <br />$6,700.00 <br />43 <br />5'0" Diameter Manhole 16' -18' <br />2 <br />EA <br />$4,700.00 <br />$9,400.00 <br />44 <br />5'0" Diameter Manhole 20' -22' <br />0 <br />EA <br />$6,100.00 <br />$0.00 <br />45 <br />5'0" Diameter Manhole 22' -24' <br />0 <br />EA <br />$6,600.00 <br />$0.00 <br />46 <br />5'0" Diameter Manhole 24 -26' <br />3 <br />EA <br />$7,100.00 <br />$21,300.00 <br />47 <br />5'0" Diameter Manhole 26' -28' <br />1 <br />EA <br />$7,700.00 <br />$7,700.00 <br />48 <br />5'0" Diameter Manhole 29' -30' <br />0 <br />EA <br />$10,100.00 <br />$0.00 <br />49 <br />Select Fill Allowance <br />6,000 <br />CY <br />$18.00 <br />$108,000.00 <br />50 <br />Rock Excavation and Disposal Allowance <br />9,500 <br />CY <br />$65.00 <br />$617,500.00 <br />51 <br />Dewaterin Provisional <br />1 <br />LS <br />$30,000.00 <br />$30,000.00 <br />52 <br />1 Pump Station <br />1 <br />LS <br />$675,000.00 <br />$675,000.00 <br />53 <br />jPump Station Site Work <br />1 <br />t LS <br />$40,000.00 <br />$40,000.00 <br />Item C Sub -total <br />$2,582,620.00 <br />Item D <br />GravIty Llne S -2 <br />54 <br />8" PVC SDR 35 Gravity Sewer 6' -10' <br />875 <br />LF <br />$40.00 <br />$35,000.00 <br />55 <br />4'0" Diameter Manhole 6' -8' <br />2 <br />EA <br />$2,000.00 <br />$4,000.00 <br />56 <br />4' 0" Diameter Manhole 8' -10' <br />1 <br />EA <br />$2,200.00 <br />$2,200.00 <br />57 <br />Asphalt Open Cut and Patch <br />930 <br />SY <br />$50.00 <br />$46,500.00 <br />Item D Sub -total <br />$87,700.00 <br />Item E <br />Gravity no S4 <br />55 <br />8" PVC SDR 35 Gravity Sewer 6' -10' <br />815 <br />LF <br />$40.00 <br />$32,600.00 <br />56 <br />4'0" Diameter Manhole 6' -8' <br />3 <br />EA <br />$2,000.00 <br />$6,000.00 <br />57 <br />Asphalt Open Cut and Patch <br />550 <br />SY <br />$50.00 <br />$27,500.00 <br />Item E Sub -total <br />$66,100.00 <br />Sub -total <br />$3,970,770.00 <br />Conten envy (10 %) <br />$397,077.00 <br />Sub -total <br />$4,367,847.00 <br />Engineering Design / Survey / ROW Acquisition Fees <br />$317,000.00 <br />Railroad Encroachment <br />$30,000.00 <br />Geotechnical Report Fees Not- to-Exceed <br />$20,000.00 <br />Wetlands Delineation Fees (Not -to- Exceed ) <br />$10,000.00 <br />Permit Fees <br />$5,000.00 <br />Project Total <br />$4,749,847.00' <br />Page 2 of 2 <br />