Browse
Search
ORD-2014-021 Buckhorn-Mebane EDD Phase 2 Sewer Extension – Amendment of Design Contract and Approval of Budget Amendment #7-C
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2014
>
ORD-2014-021 Buckhorn-Mebane EDD Phase 2 Sewer Extension – Amendment of Design Contract and Approval of Budget Amendment #7-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 9:53:20 AM
Creation date
5/13/2014 12:56:29 PM
Metadata
Fields
Template:
BOCC
Date
5/8/2014
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
6h
Document Relationships
Agenda - 05-08-2014 - 6h
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 05-08-2014 - Regular Mtg.
Minutes 05-08-2014
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Za/4.-x7 <br />T1aA0.AJ,�'c� <br />Hobbs Upchurch Associates <br />engineering I planning I surveying <br />April 22, 2014 <br />Orange County — Planning and Inspections Department <br />ATTN: Mr. R. Kevin Lindley, P.E. <br />133 W. Margaret Lane <br />Hillsborough, NC 27278 <br />RE: Buckhorn — Mebane Economic Development District — Phase II <br />Professional Engineering Services - Contract Amendment #2A (REVISED LETTER) <br />(HUA Project Number: OC1202) <br />Dear Kevin: <br />This letter herewith is provided to serve as Contract Amendment #2A to the Original 2010 Contract for the <br />project identified as Buckhorn - Mebane Economic Development District (EDD) — Phase II. This letter will <br />summarize the original project scope as well as delineate the items to be covered by this amendment to <br />the original project scope and original contract. <br />Original 2010 Contract <br />Hobbs, Upchurch & Associates, P.A. (HUA) and Orange County entered into a contract dated November <br />4, 2010 to provide surveying, engineering design, and permitting for the project identified as Buckhorn - <br />Mebane Economic Development District (EDD) — Phase II. Note that the "Efland Extension" to Buckhorn <br />— Mebane EDD — Phase II was added later as part of Contract Amendment #2. <br />Original Proiect Scope <br />In general terms, the original project was designed to collect sewage from the area / unincorporated <br />community known as Efland. Currently, the majority of Efland's sewer is collected at a pump station on <br />Brookhollow Road and pumps toward Hillsborough along Oak Street and the project would have picked <br />up the forcemain on Oak Street and redirect it towards Mebane. This forcemain would then have <br />connected to a small gravity sewer project in the northwestern interchange of 1-40 / 1 -85 and Mt. Willing <br />Road. The project included a pump station on the north side of 1-40 /1-85 at the low area, 1,500 LF west <br />of this interchange. <br />From this pump station, effluent from the unincorporated community of Efland and adjacent additional <br />gravity sewer area would have been pumped to the Gravelly Hill Pump Station and on into the City of <br />Mebane. Also, HUA looked at additional pump stations in this eastern portion of the Buckhorn - Mebane <br />EDD. This area was identified on the original area map (See also Exhibit A: Figure 1, as attached) as <br />Areas D -2, D -3, D-4 and all of E. <br />Amended Proiect Scope <br />Following several meetings with the County staff, the City of Mebane and the new HUA project team, the <br />best solution was identified as the "West Ten Road Pump Station" project. This revised project includes <br />all the original sewer improvements and combines two pump stations into one on West Ten Road <br />(adjacent to an unnamed tributary of Seven Mile Creek which runs adjacent to Stephanie Lane, on the <br />north side of West Ten Road). This project adds approximately 4,500 LF of gravity sewer and additional <br />easements. The project also includes gravity sewer east of and past the 1 -40 / Mt. Willing Road <br />interchange through pasture lands opening up 100 acres for future development. This revision also <br />provides a gravity sewer location to the north side of Norfolk Southern Railroad to allow for potential <br />development sewage to be pumped into a gravity manhole north of the railroad. (See also Exhibit B: <br />Figure 2, as attached.) Also, attached, as Exhibit C, is the final Opinion of Probable Cost for the <br />project. <br />Another significant difference between the two projects is the estimated construction cost. The original <br />project was estimated at $2.2 Million with the new and much - improved project scope at $4.8 Million. <br />Although the cost has increased, it resolves the request of the City of Mebane to minimize pump stations <br />and opens up much more developable and usable land area within the Buckhorn — Mebane EDD as well <br />T-910.692.5616 I F:910.692.7342 j 135 W. CONNECTICUT AVE. I SOUTHERN PINES, NC 28387 1 WWW.HCBBSUPCHURCH.00k: <br />SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.