Orange County NC Website
5 <br />Estimated Project Budget <br />Blackwood Farm Parks Operations Base <br />Acquisition /Construction: <br />Acquisition <br />Construction - Main Building $150 /SF, estimated 2,200 SF <br />Constuction - Shop $90 /SF, estimated 5,000 SF <br />Construction - Covered StorageMork Area $30 /SF, estimated 2,000 SF <br />Construction - Fenced area for equipment, materials $15 /SF, estimated 10,000 SF <br />Professional Services: <br />Designer <br />Reimbursables <br />Construction Materials Testing <br />Cultural & Archaeological <br />Owner Costs <br />Furniture, Materials <br />Audio - Visual, Low Voltage <br />Signage <br />Owner Contingency <br />8% of total construction cost <br />Budget <br />Budget <br />Cost SubTotal <br />0 <br />330,000 <br />450,000 <br />concrete floor 60,000 <br />reinforced concrete 150,000 <br />79,200 <br />7,500 <br />2,500 <br />2,500 <br />Budget 20,000 <br />Budget 10,000 <br />Budget 7,500 <br />10% of Construction Estimate 99,000 <br />990,000 <br />91,700 <br />136,500 <br />Total Estimated Project Cost 1,218,200 <br />