Orange County NC Website
CHANGE ORDER <br /> PROJECT: Roof Replacement CHANGE ORDER NO. 1 <br /> Court Sheet Annex DATE: January 8,2014 <br /> Battle Court <br /> Hillsborough,NC PROJECT NO. 12-58 <br /> CONTRACT DATE: October 14,2013 <br /> TO: Owens Roofing,Inc. CONTRAC FOR: Roof replacement <br /> 301 W.Cabarrus Street <br /> Raleigh,NC 27601 <br /> The Contract is changed as follows: <br /> F <br /> ITEM NO. Description <br /> a <br /> 1. Furnish and install four scuppers to include conductor heads and downspouts <br /> At Battle Court Add $ 3,390 <br /> New scupper and conductor heads needed for rework of roof drainage due to hidden deck conditions—concrete <br /> deck was found to be sloped away from existing internal roof drains. <br /> The original Contract Sum was $129,592 <br /> Net change by previously authorized Change Orders $ -0- <br /> The Contract Sum prior to this Change Order was $129,592 .� <br /> The Contract Sum will be INCREASED by this Change Order in the amount of $ 3,390 �q <br /> The new Contract Sum including this Change order will be $132,982 <br /> t <br /> i <br /> The Contract Time will remain unchanged by this Change Order <br /> Accepted By: <br /> Owens Roofing,Inc Oran e C ft (sset a e 5thWa11 <br /> CONTRA R OWN OTHER <br /> 4zoi�z JLS <br /> IF <br /> By: y: By: <br /> Date: Date: Date: 10814 <br /> This instrument has been pre-audited in the <br /> manner required by the L Government <br /> ,$udget and Fit�al C rol Act <br /> Clarence G. Grier,Assistant Co. Manager& <br /> CFO <br />