Browse
Search
2014-199 AMS - Owens Roofing for Change Order #1 Court Street Annex/Battle Courtroom for roof replacement $3,390
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-199 AMS - Owens Roofing for Change Order #1 Court Street Annex/Battle Courtroom for roof replacement $3,390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2014 11:50:06 AM
Creation date
5/7/2014 11:12:18 AM
Metadata
Fields
Template:
BOCC
Date
5/5/2014
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2014-199 AMS - Owens Roofing for Change Order @ Court St. Annex/Battle Courtroom for roof replacement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br /> PROJECT: Roof Replacement CHANGE ORDER NO. 1 <br /> Court Sheet Annex DATE: January 8,2014 <br /> Battle Court <br /> Hillsborough,NC PROJECT NO. 12-58 <br /> CONTRACT DATE: October 14,2013 <br /> TO: Owens Roofing,Inc. CONTRAC FOR: Roof replacement <br /> 301 W.Cabarrus Street <br /> Raleigh,NC 27601 <br /> The Contract is changed as follows: <br /> F <br /> ITEM NO. Description <br /> a <br /> 1. Furnish and install four scuppers to include conductor heads and downspouts <br /> At Battle Court Add $ 3,390 <br /> New scupper and conductor heads needed for rework of roof drainage due to hidden deck conditions—concrete <br /> deck was found to be sloped away from existing internal roof drains. <br /> The original Contract Sum was $129,592 <br /> Net change by previously authorized Change Orders $ -0- <br /> The Contract Sum prior to this Change Order was $129,592 .� <br /> The Contract Sum will be INCREASED by this Change Order in the amount of $ 3,390 �q <br /> The new Contract Sum including this Change order will be $132,982 <br /> t <br /> i <br /> The Contract Time will remain unchanged by this Change Order <br /> Accepted By: <br /> Owens Roofing,Inc Oran e C ft (sset a e 5thWa11 <br /> CONTRA R OWN OTHER <br /> 4zoi�z JLS <br /> IF <br /> By: y: By: <br /> Date: Date: Date: 10814 <br /> This instrument has been pre-audited in the <br /> manner required by the L Government <br /> ,$udget and Fit�al C rol Act <br /> Clarence G. Grier,Assistant Co. Manager& <br /> CFO <br />
The URL can be used to link to this page
Your browser does not support the video tag.