Browse
Search
2014-200 AMS - Mark Hall Electric Inc. for West Campus Bldg. for electrical work $3,560
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-200 AMS - Mark Hall Electric Inc. for West Campus Bldg. for electrical work $3,560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2014 11:02:51 AM
Creation date
5/7/2014 11:02:49 AM
Metadata
Fields
Template:
BOCC
Date
5/5/2014
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2014-200 AMS - Mark Hall Electric Inc. for West Campus Bldg for electrical work
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.O.Box 218 <br /> Alamance,NC 27201 Estimate <br /> 336-570-0158 <br /> Date: 4/10/2014 <br /> Estimate # 4331 <br /> Prepared for: <br /> Orange County <br /> Project: <br /> West Campus Core Drill <br /> Description Quantity Rate Amount <br /> West Campus Hillsborough-Core Drill Thru 3 Floors To Run 2 <br /> 1/2" Conduit From the 3rd Floor To Basement,Providing A <br /> 12x12x6" Junction Box On Each Floor For Future Access.Refeed <br /> A Circuit From A Condenser On The Roof To An Emergency <br /> Panel In The Basement.Feed Air Handler Unit In Basement Top <br /> Emergency Panel Also <br /> Technician Labor Hours 40 45.00 1,800.00 <br /> Materials 1,610.00 1,610.00 <br /> Electrical Permit 1 150.00 150.00 <br /> Total $3,560.00 <br /> PRICES SUBJECT TO CHANGE DUE TO COPPER MARKET INFLATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.