Browse
Search
Agenda - 05-08-2014 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 05-08-2014 - Regular Mtg.
>
Agenda - 05-08-2014 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 3:40:55 PM
Creation date
5/2/2014 4:46:02 PM
Metadata
Fields
Template:
BOCC
Date
5/8/2014
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 05-08-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />Should the Board choose moving forward with the Alternate Plan, an additional two months <br />would be required for the design phase of the project. <br />Concurrent to the design efforts, staff will moderate a process with regard to programming <br />needs and interests. <br />FINANCIAL IMPACT: The Board approved the FY2012 -17 Capital Investment Plan ( "CIP ") <br />that included $250,000 in FY 2012 -13 for deconstruction of sections of the facility in preparation <br />for the future use on the site. The Board also approved $2.0 million in FY2014 -15 for the <br />design and construction of the new facility that, when combined with the $250,000 authorized in <br />FY 2012 -13, brings the total project capital budget to $2,250,000. <br />Should the Board approve the Base Plan, the cost of the project is estimated at $2,363,526. <br />Estimated additional funds of $113,526 would need to be appropriated to the project. This total <br />project cost includes the additional classroom space discussed in the March 11, 2014 work <br />session, the potential park and ride lot shelter, and an increased construction contingency <br />amount (15 %) driven by the forecast increased construction costs as the economy continues to <br />improve. <br />Should the Board approve the Alternate Plan, the cost of the project is estimated at $3,072,226. <br />Estimated additional funds of $822,226 would need to be appropriated to the project. This total <br />project cost includes the additional elements discussed above in the Base Plan, plus the <br />estimated $708,700 needed for the Alternate Plan additional scope. This scope also includes <br />an estimated $75,000 for a dock door system to be installed for the potential PFAP or other <br />tenant use. <br />RECOMMENDATION(S): The Manager recommends the Board: <br />1) Confirm the project plan as approved in the FY2013 -14 Capital Investment Plan and <br />presented to the Board of County Commissioners during the November 12, 2013 and <br />March 11, 2014 work sessions ( "Base Plan "); or <br />2) Amend the project plan by directing staff to maintain the classroom wings for future <br />occupancy and /or minimally conditioned storage available for both County <br />department and County tenant use ( "Alternate Plan "); or <br />3) Provide new direction to staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.