Orange County NC Website
HOBBS, UPCHURCH & ASSOCIATES, P.A. <br />Consulting Engineers <br />Southern Pines, NC <br />22-Apr-14 <br />Buckhom- Mebane EDD Sewer Improvements <br />Orange County, NC <br />Phase 2 - West Ten Road Pump Station <br />Opinion of Probable Costs <br />ITEM <br />DESCRIPTION <br />QTY. <br />UNIT <br />UNIT PRICE <br />TOTAL PRICE <br />1 <br />WIN <br />Seed & Mulch & Erosion Control <br />14 <br />AC <br />$4,000.00 <br />$56,000.00 <br />2 <br />Clearing and Grubbing <br />4.5 <br />AC <br />$3,500.00 <br />$15,750.00 <br />3 <br />Gravel for Driveways <br />300 <br />TN <br />$30.00 <br />$9,000.00 <br />4 <br />Asphalt Open Cut and Patch <br />550 <br />SY <br />$50.001 <br />$27,500.00 <br />5 <br />Concrete Open Cut and Patch <br />100 <br />Sy <br />$90.00 <br />$9,000.00 <br />Item A Sub -total <br />$117,250.00 <br />1� / % / % /% /i�,��, <br />news <br />6 8" PVC SDR 21 Forcemain 1,200 LF $35.00 $42,000.00 <br />7 <br />8" 90 Degree Bend <br />1 <br />EA <br />$1,050.00 <br />$1,050.00 <br />8 <br />8"22.5 Degree Bend <br />4 <br />EA <br />$1,050.00 <br />$4,200.00 <br />9 <br />8" Isolation Valve <br />1 <br />EA <br />$1,600.00 <br />$1,600.00 <br />10 <br />12" PVC SDR 21 Forcemain <br />18,000 <br />LF <br />$40.00 <br />$720,000.00 <br />11 <br />12 <br />12" Restrained Joint D.I.P. <br />16" ID HDPE DR 9 Installed by Directional Bore <br />600 <br />6 <br />LF <br />EA <br />$70.00 <br />$32,500.00 <br />$42,000.00 <br />$195,000.00 <br />13 <br />12" 90 Degree Bend <br />0 <br />EA <br />$1,100.00 <br />$0.00 <br />14 <br />15 <br />16 <br />17 <br />12"45 Degree Bend <br />12" 22.5 Degree Bend <br />12" Isolation Valve <br />Isolation Restraint Joint <br />24 <br />10 <br />9 <br />400 <br />EA <br />EA <br />EA <br />LF <br />$1,050.00 <br />$1,080.00 <br />$1,650.0 <br />$90.00 <br />$25,200.00 <br />$10,800.00 <br />$14,850.00 <br />$36,000.00 <br />18 <br />Combination Air Release Valve Assembly in Manhole <br />4 <br />EA <br />$5,000.00 <br />$20,000.00 <br />19 Tie to Existing Manhole <br />Item B Sub -total 1 <br />1 <br />EA <br />$4,400.00 <br />$4,400.00 <br />$1,117,100.00 <br />/, � /// / / / / / / //i / /i/ , i i % / /,/ / iii � „// , /, % %a�/ �= <br />20 8" D.I.P. Class 52 Gravity Sewer 6' -10' 295 LF $70.00 $20,650.00 <br />21 <br />10" PVC SDR 35 Gravity Sewer 6' -10' <br />4,025 <br />LF <br />$40.00 <br />$161,000.00 <br />22 <br />10" PVC SDR 35 Gravity Sewer 10' -14' <br />0 <br />LF <br />$50.00 <br />$0.00 <br />22 <br />10" D.I.P. Class 52 Gravity Sewer 6' -10' <br />100 <br />LF <br />$75.00 <br />$7,500.00 <br />23 <br />10" D.I.P. Class 52 Gravity Sewer 10' -12' <br />200 <br />LF <br />$80.00 <br />$16,000.00 <br />24 <br />10" D.I.P. Class 52 Gravity Sewer 12' -14' <br />0 <br />LF <br />$85.00 <br />$0.00 <br />25 <br />10" D.I.P. Class 52 Gravity Sewer 14' -16' <br />250 <br />LF <br />$95.00 <br />$23,750.00 <br />26 <br />10" D.I.P. Class 52 Gravity Sewer 16' -18' <br />0 <br />LF <br />$110.00 <br />$0.00 <br />27 <br />10" D.I.P. Class 52 Gravity Sewer 18' -20' <br />0 <br />LF <br />$140.00 <br />$0.00 <br />27 <br />10" D.I.P. Installed in Casing <br />200 <br />LF <br />$80.00 <br />$16,000.00 <br />28 <br />12" PVC SDR 35 Gravity Sewer 6' -10' <br />0 <br />LF <br />$50.00 <br />$0.00 <br />29 <br />12" PVC SDR 35 Gravity Sewer 10' -14' <br />0 <br />LF <br />$75.00 <br />$0.00 <br />30 <br />12" D.I.P. Class 52 Gravity Sewer 6' -10' <br />250 <br />LF <br />$85.00 <br />$21,250.00 <br />31 <br />12" D.I.P. Class 52 Gravity Sewer 10' -14' <br />100 <br />LF <br />$110.00 <br />$11,000.00 <br />32 <br />12" D.I.P. Class 52 Gravitv Sewer 14' -18' <br />310 <br />LF <br />$130.00 <br />$40,300.00 <br />33 <br />12" D.I.P. Class 52 Gravity Sewer 18' -22' <br />0 <br />LF <br />$250.00 <br />$0.00 <br />34 <br />12" D.I.P. Class 52 Gravity Sewer 22 -26' <br />1,078 <br />LF <br />$290.00 <br />$312,620.00 <br />35 <br />12" D.I.P. Class 52 Gravity Sewer (26' -30') <br />0 <br />LF <br />$350.00 <br />$0.00 <br />Page 1 of 2 <br />