Orange County NC Website
PTO <br />Hobbs Upchurch Associates <br />anginoering I planomig I stir in v, <br />Suckhorn-Mebane EDD Phase 2 <br />Sewer Improvements to serve the Efland Community <br />Orange County, NC <br />Prefirninary Cost Estimate <br />ILOM - <br />Quantity <br />YAU-fte- <br />Extended Cos <br />10-Inch SDR 35 Sanitary Sewer <br />2,300 <br />If <br />$60.00. <br />$138,000.00 <br />104n'ch DI Sanitary Sewer <br />300 <br />If <br />$75.00 <br />$22,500.00 <br />4-foot Diameter Manhole <br />10 <br />1,400 <br />ea <br />If <br />$2,750.00 <br />. .... <br />$18.00 <br />...... $27,500.00 <br />$25,200.00 <br />SDR 21 Forcemain <br />81' CL 250 D1 Forcemain .. . ...... . <br />360 <br />If <br />$35.0-0- <br />$12,600.00 <br />i PVC SDR 21 Forcemain <br />6,950 <br />If <br />---------- <br />$22.00 <br />.......... <br />$152,900.00 <br />1011 CL 250 DI Forcemain <br />500 <br />ea <br />$50.00 <br />$25,000.00 <br />10" ID HDPE Installed by Directional Bore <br />1,750 <br />If <br />$450.00 <br />$787,500.00 <br />16" Steel Casing installed by Bore <br />280 <br />If " <br />$200.00 <br />....... <br />$56,000.00 <br />20" Steel Casing Installed by Bore & Jack <br />380 <br />If <br />$250.00 <br />$95,000.00 <br />20" Steel Casing Installed on Grade by Bore & <br />Jack <br />60 <br />If <br />$350.00 <br />$21,000.00 <br />Tie to Existing Forcemain__ <br />1 <br />.... . . .... <br />i, bo <br />Existing Pump Station Modifications ........... <br />I <br />Is <br />$75,000.00 <br />$75,000.00 <br />Duplex Submersible Pump Station <br />"-Generator <br />I <br />Is <br />$195,000.00 <br />- - . <br />$195,000.00 <br />ii�i�i6i-Emergency <br />1 <br />Is <br />$60,000.00 <br />$60,000.00 <br />Clearing <br />2.25 <br />ac <br />$4,000.00 <br />$9,000.00 <br />Select Fill <br />1,500 <br />cy <br />$20.00 <br />$30,000.00 <br />Asphalt open cut & Patch <br />240s <br />$50.00 <br />$12,000.00 <br />Concrete Drive Removal & Replacement <br />25 <br />sy <br />$350.00 <br />$8,750.00 <br />Seed Mulch & Erosion Control <br />8.50 <br />ac <br />$3,000.00 <br />Total Estimated Construction Cost: ... ...... . . ....... .......... . ......... . <br />$1,781,450.00 <br />Construction Contingency: . . ..... ............. <br />...... .... <br />$178,145.00 <br />Survey: <br />...... ...................... <br />$18,000.00 <br />Engineering Design: <br />$133,600.00 <br />Construction Administration & Inspection: .. ....... . ....... .. ------ ---- <br />$115,800.00 <br />. <br />R/R Encroachment . . . .. ........ . ..... ..... .. . ........... ------- ........ ... . . <br />$25,000.00 <br />$1010W.00 <br />Easement Acquisition <br />Permits <br />$2,000.00 <br />Total Estimated Project Cost: <br />$2,263,995.00 <br />T.910.692.5616 I F.'910.692.7342 13008W BROAD STREET I SOUTHERN PINES, NO 20387 1 WWW.HOBBSUPCHURCKCOM <br />SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN <br />