Browse
Search
Agenda - 05-08-2014 - 6h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 05-08-2014 - Regular Mtg.
>
Agenda - 05-08-2014 - 6h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 12:35:07 PM
Creation date
5/2/2014 3:17:08 PM
Metadata
Fields
Template:
BOCC
Date
5/8/2014
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
6h
Document Relationships
Minutes 05-08-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
ORD-2014-021 Buckhorn-Mebane EDD Phase 2 Sewer Extension – Amendment of Design Contract and Approval of Budget Amendment #7-C
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br />Attachment 2B-- '2, a. <br />Hobbs Upchurch Associates <br />engineering I planning i surveying <br />August 3, 2012 <br />Mr. Craig Benedict <br />Orange County Planning & Inspection <br />131 W. Margaret Lane <br />Hillsborough, NC 27278 <br />RE: Efland Sewer System <br />Re- Routing Sewer Discharge to Gravelly Hill <br />Engineering Design Services Proposal <br />Dear Mr. Benedict: <br />Per our previous discussions, and in accordance with our preliminary engineering report for the <br />Buckhorn- Mebane EDD project, HUA offers to provide engineering design services for the <br />above referenced project. Our design services shall adhere to the conditions, expectations, and <br />level of service as noted in our original contract with Orange County dated November 4, 2010. <br />Following is a summary of the proposed costs: <br />Surveying $18,000.00 <br />Engineering Design $133,600.00 <br />Please find attached a copy of the detailed estimate and layout map for the proposed project. <br />Upon execution of an amendment to our contract to complete this work, we will schedule a <br />meeting to review the previously completed report, all the latest Efland design information, and <br />develop a detailed work schedule. <br />If you should require additional information, or wish to discuss the project further, please do not <br />hesitate to contact this office. <br />Sincerely, <br />HOBBS, UPCHUR & ASSOCl04,., � <br />� <br />2o..o�ES S�oy ti� <br />a� SEAL <br />Bill Lester, Jr., P.E <br />17651 <br />l ` <br />7:010.692,6016 1 F; 910.892.7342 1 300 SW BROAD STREET I SOUTHERN PINES. NC 28397 i WWW,HOBBSUPCHURCH.COM <br />SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.