Orange County NC Website
FINANCIAL IMPACT: Based on 10 -year student growth projections, CHCCS has projected <br />capital facility construction needs as follows: <br />New Elementary #12 2020 -2021 <br />New Middle School #5 2020 -2021 <br />Expanded High School 2023 -2024 <br />Based on 10 -year student growth projections, OCS has projected capital facility construction <br />needs as follows: <br />New Elementary # 8 2023 -2024 <br />Expanded High School 2022 -2023 <br />Section 7 of the Schools Adequate Public Facilities Memorandum of Understanding (MOU) <br />states, "Orange County will use its best efforts to provide the funding to carry out the Capital <br />Improvement Plan referenced in Section 1 above." <br />At the January SAPFOTAC meeting, members discussed the increased number of students <br />generated in both districts and proposed multi - family projects that may continue to have an <br />effect on student membership numbers. While this may be a short term trend caused by the <br />current economic climate or other factors, the SAPFOTAC recommended further evaluation of <br />the adopted Student Generation Rates and the impacts different types of housing (and bedroom <br />count implication, if possible) may have on student membership rates. <br />As a result, Orange County has entered into a contract with Tischler -Bise to study student <br />generation rates of newer housing (that has been constructed in the past ten years) in the <br />Orange County and Chapel Hill - Carrboro City School Districts. This study will only include <br />student generation rates and will not include school impact fees. The cost for this study is <br />$14,060. Existing funds from the Orange County Department of Planning and Inspections' <br />2013 -2014 budget will be utilized to fund the study. <br />Neither Orange County Planning nor non - departmental budgets have added any contractual <br />services monies for re- analysis of school impact fees. The final phase of a 4 -year school impact <br />fee escalation concluded on January 1, 2012 (fee schedule <br />at: http: / /orangecountync.gov /planning /PDFs/ fees /School %20Impact %20Fees.pdf). These fees <br />reflected an approximate 60% recuperation of actual costs to provide for `student stations' <br />based on a 2007 -08 consultant study. The last impact fee level study (which includes the <br />calculation of student generation rates, albeit for all housing stock, which is the legally <br />defensible method for impact fees) was conducted in 2007 so it may be time to initiate another <br />study to ensure up -to -date data is used for both SAPFO purposes and impact fee purposes. <br />RECOMMENDATION(S): The Manager recommends the Board approve the 2014 SAPFOTAC <br />Annual Report and certify those aspects of the Report detailed in the summary table above. <br />