Browse
Search
Agenda - 05-08-2014 - 6g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 05-08-2014 - Regular Mtg.
>
Agenda - 05-08-2014 - 6g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 3:57:34 PM
Creation date
5/2/2014 3:13:23 PM
Metadata
Fields
Template:
BOCC
Date
5/8/2014
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
6g
Document Relationships
Minutes 05-08-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINANCIAL IMPACT: Based on 10 -year student growth projections, CHCCS has projected <br />capital facility construction needs as follows: <br />New Elementary #12 2020 -2021 <br />New Middle School #5 2020 -2021 <br />Expanded High School 2023 -2024 <br />Based on 10 -year student growth projections, OCS has projected capital facility construction <br />needs as follows: <br />New Elementary # 8 2023 -2024 <br />Expanded High School 2022 -2023 <br />Section 7 of the Schools Adequate Public Facilities Memorandum of Understanding (MOU) <br />states, "Orange County will use its best efforts to provide the funding to carry out the Capital <br />Improvement Plan referenced in Section 1 above." <br />At the January SAPFOTAC meeting, members discussed the increased number of students <br />generated in both districts and proposed multi - family projects that may continue to have an <br />effect on student membership numbers. While this may be a short term trend caused by the <br />current economic climate or other factors, the SAPFOTAC recommended further evaluation of <br />the adopted Student Generation Rates and the impacts different types of housing (and bedroom <br />count implication, if possible) may have on student membership rates. <br />As a result, Orange County has entered into a contract with Tischler -Bise to study student <br />generation rates of newer housing (that has been constructed in the past ten years) in the <br />Orange County and Chapel Hill - Carrboro City School Districts. This study will only include <br />student generation rates and will not include school impact fees. The cost for this study is <br />$14,060. Existing funds from the Orange County Department of Planning and Inspections' <br />2013 -2014 budget will be utilized to fund the study. <br />Neither Orange County Planning nor non - departmental budgets have added any contractual <br />services monies for re- analysis of school impact fees. The final phase of a 4 -year school impact <br />fee escalation concluded on January 1, 2012 (fee schedule <br />at: http: / /orangecountync.gov /planning /PDFs/ fees /School %20Impact %20Fees.pdf). These fees <br />reflected an approximate 60% recuperation of actual costs to provide for `student stations' <br />based on a 2007 -08 consultant study. The last impact fee level study (which includes the <br />calculation of student generation rates, albeit for all housing stock, which is the legally <br />defensible method for impact fees) was conducted in 2007 so it may be time to initiate another <br />study to ensure up -to -date data is used for both SAPFO purposes and impact fee purposes. <br />RECOMMENDATION(S): The Manager recommends the Board approve the 2014 SAPFOTAC <br />Annual Report and certify those aspects of the Report detailed in the summary table above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.