Orange County NC Website
Ordinance <br />Requirements <br />2.7.3 (B) (3) <br />Relevant information <br />needed to show <br />compliance with the <br />general and specific <br />standards governing the <br />Special Use <br />2.7.3 (B) (4) <br />Twenty -six (26) copies of <br />the site plan prepared by <br />a registered N.C. land <br />surveyor, architect, or <br />engineer. <br />2.7.3 (B) (5) <br />If the application involves <br />a Preliminary Subdivision <br />Plat, 26 copies of the Plat <br />prepared in accordance <br />with Section 7.14 shall be <br />provided. <br />2.7.3 (B) (6) <br />A list of all parcels located <br />within 500 feet of the <br />subject parcel and the <br />name and address of <br />each property owner, as <br />currently listed in the <br />Orange County tax <br />records. <br />2.7.3 (B) (7) <br />Elevations of all structures <br />proposed to be used in <br />the development. <br />W. <br />PLANNING <br />BOARD <br />EVIDENCE SUBMITTED <br />RECOMMENDED <br />TO SUPPORT <br />BOCC <br />FINDINGS <br />FINDINGS <br />FINDINGS <br />X Yes No <br />Attachment 1 of the <br />_Yes No <br />February 24, 2014 <br />Quarterly Public Hearing <br />packet contained the <br />required detail including <br />a site plan denoting the <br />boundary of the property. <br />X Yes No <br />Staff testimony from the <br />_Yes No <br />February 24, 2014 <br />Quarterly Public Hearing <br />indicating required <br />copies of the site plan, <br />prepared by Strata Solar <br />and sealed by Mr. Brent <br />Niemann License <br />Number 026475 were <br />submitted as part of <br />Attachment 1. <br />_X_ Not <br />The Project does not <br />_ Not applicable <br />applicable <br />involve a preliminary <br />X Yes No <br />subdivision application <br />Attachment(s) 1 and 4 of <br />the February 24, 2014 <br />Quarterly Public Hearing <br />packet contained the <br />required information <br />X Yes No While no buildings are <br />proposed for the site, <br />Attachment 1 of the <br />February 24, 2014 <br />Quarterly Public Hearing <br />packet contained a site <br />plan containing <br />elevations of the <br />proposed solar arrays. <br />Yes No <br />Yes No <br />