27 <br />contours, very minimal grading, 4 or 5 ten foot square 100 square foot pads inside the plant that <br />have an inverter and a transformer. And then we will re -plant the project, and at the end of the <br />day the project will have approximately 1 percent impervious surface. <br />This is a project just completed in Orange County. This is the White Cross Solar Farm. This <br />gives you an idea of — that's just a pretty good perspective of what panels look like and how we <br />follow the existing contours. I feel like that's been very positively received in the County - The <br />White Cross Solar Farm. The panels are polycrystalline silicon photovoltaic cell panels. As you <br />just saw, they are flat blue in color. Sun hits the panels, hits really what is very similar to <br />computer chip material, and that creates a small amount of DC current. Each one of those <br />panels is like a giant tributary. It's sort of like water coming down a mountain. The DC current <br />accumulates in this tributary system. It's converted to AC current in each one of these inverters <br />and then the transformers convert it to exactly the same power that's in the Duke Energy local <br />lines. This is a completely passive system. There is not fuel; there is no waste; no emissions; <br />no noise; no moving parts; no operator. It's a truly passive renewable energy system. <br />We are required to obtain, from the North Carolina utility commission, a certificate of public <br />necessity and convenience for each plant. We've obtained probably 70 of these at this point. <br />And it is the policy — it is the public policy of the state of North Carolina to promote renewable <br />energy. The power is sold to Duke Power under a long term 20 year power purchase <br />agreement contract. That contract is also regulated by the utility commission, and the projects <br />are financed through a combination of tax credit investors and the income from these power <br />purchase agreements. We will of course obtain all necessary DEANR permits, DOT permits <br />and a local electrical permit. We don't usually get a building permit, because we don't really do <br />any construction. The project will not impact municipal services, schools, utilities. A typical <br />project is surrounded by either the installed buffers Mr. Harvey spoke about, or has existing <br />buffers, and those buffers are generally subject to conditions that you all could set. At the end <br />of the 20 or 30 years, if the project is extended, they are easily removed, and the site is put back <br />to — close to - its original condition, and in general, the salvage value exceeds the removal. <br />This - I think Mr. Harvey had a better map — shows the location of the project, and it's <br />surrounded by a variety of uses - I believe within the center —in a long range plan area - <br />designated area for commercial development. These are some of the uses around the facility <br />and things that we think create a similar impact- a large scale single family residential <br />development; a manufacturing facility; warehouse; there is a public works facility adjacent to the <br />site; a large school facility. Mr. Kirkland will speak in more detail about this, but solar farms are <br />low impact developments. They create no noise, no emission, no odor, no hazardous materials <br />and almost no traffic — one trip a month to maintain the site. They are much lower in height, <br />traffic, noise, light, etc. than most other development. They are literally dark at night. We don't <br />propose any lighting on this sight. It is a passive use and it generally harmonizes with adjacent <br />uses and it establishes the certainty of a long term, low intensity use. Our engineers will speak <br />to the following issues in general. This project will not endanger the public health or safety. The <br />project will meet all of your codes. The project will generate less than trip per month, and no <br />utilities are required or used. <br />In conclusion, these are your general SUP conditions, and we would just like to close by saying <br />that we feel like we are going to present evidence that we meet all three of these conditions. <br />The use will maintain or promote the public health, safety and general welfare. The use will <br />maintain or enhance the value of contiguous property, and the use is a public necessity. And <br />the location and character of the use is in harmony with the area, and in compliance with your <br />comprehensive plan. Thank you very much. If you have any questions, I would be glad to <br />answer them. <br />