Browse
Search
Agenda - 10-17-2006-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 10-17-2006
>
Agenda - 10-17-2006-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:22:45 AM
Creation date
8/28/2008 8:48:59 AM
Metadata
Fields
Template:
BOCC
Date
10/17/2006
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20061017
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br />4. Budget line item examination and improvement. On a more tactical level, I <br />recommend that the County and CHCCS staffs work together to: <br />1) remove redundancies in costs within the budget; <br />2) examine and negotiate third party standards and scopes of service; and <br />3) disconnect cost expectations and fee structures from the hard construction <br />costs. <br />Again, I have presented variations of these themes for improvement with the joint <br />County and CHCCS staffs and have had the same positive response in working <br />through them for presentation to the BOCC and CHCCS School Board over the <br />next several weeks. <br />5. Inclusion of the Orange County Schools within the spirit of the policy and budget <br />improvement process. All of these themes should be applicable to the Orange <br />County School System. At some point and with the appropriate protocol, the <br />Orange County Staff should be invited to the discussions. <br />I look forward to continuing to work with the County and CHCCS Staffs on these <br />initiatives. I am confident that, together, we can present a defensible, reasonable <br />budget ready for approval at the appropriate point after construction bids are received <br />and evaluated (targeted for the January BOCC meeting cycle). This presentation time <br />will not extend the anticipated CHCCS construction schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.