Browse
Search
Agenda - 10-17-2006-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 10-17-2006
>
Agenda - 10-17-2006-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:22:45 AM
Creation date
8/28/2008 8:48:59 AM
Metadata
Fields
Template:
BOCC
Date
10/17/2006
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20061017
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: October 17, 2006 <br />Action Agenda <br />Item No. ~ - q. <br />SUBJECT: Approval of Final Plans for CHCCS Elementary #10 <br />DEPARTMENT: Manager/Budget PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): INFORMATION CONTACT: <br />10/11/06 LEDAHF Memo Rod Visser, 919-245-2308 <br />Elementary #10 Site Plan Donna Dean Coffey, 919-245-2151 <br />Elementary #10 Final Building Design <br />PURPOSE: To review and approve final plans for the construction of Elementary School #10 <br />in the Chapel Hill=Carrboro City School (CHCCS) system. <br />BACKGROUND: At the June 27, 2006 regular meeting of the Orange County Commissioners, <br />the Board reviewed and approved the project concept for the construction of CHCCS <br />Elementary #10 on the northern portion of the Twin Creeks school/park campus near the <br />intersection of Old NC 86 and Eubanks Road in Chapel Hill Township. Elementary #10 is being <br />planned as a prototype using the same design (less a community gymnasium) that was used for <br />Rashkis Elementary, which opened in August 2003. The designed size of the building is <br />90,229 square feet, which is consistent with the Elementary School Construction Standards <br />approved by the Board of Commissioners in May 1996. <br />The Board of Commissioners' "Policy on Planning and Funding School Capital Projects', <br />adopted in November 2000, provides for school construction project approval in several phases. <br />As noted above, BOCC conceptual approval for the project was provided in June 2006. The <br />next phase, described in Section 6 of the policy, provides for the school system to advertise for <br />construction bids following Board of Commissioner approval .of final plans for the project. If the <br />BOCC provides that approval at this October 17 meeting, CHCCS will be able to solicit bids in <br />November with an anticipated mid-December bid opening date. As reflected in the <br />accompanying site and building design drawings, the final design of Elementary#10 is <br />substantively unchanged from the prototype design endorsed by the BOCC in June 2006. <br />Pursuant to a request from the BOCC to carefully review CHCCS' s contemplated project <br />budget for Elementary #10, County staff asked Jeff Thompson, Executive Director of the Linked <br />Economic Development and Affordable Housing Foundation (LEDAHF), to examine the project's <br />anticipated hard costs (e.g. site preparation, construction, infrastructure) and soft costs (e.g. <br />architectural, engineering, and development review fees) for conformance with the adopted <br />school construction standards and for potential savings. LEDAHF is anon-profit agency <br />previously retained by the County that has rendered excellent project and construction <br />management services related to various County projects such as the SportsPlex acquisition and <br />the development of two new senior centers. Mr. Thompson's analysis is provided in.the <br />accompanying memo. Specific cost saving opportunities will be pursued in collaboration with <br />
The URL can be used to link to this page
Your browser does not support the video tag.