Orange County NC Website
• Deconstruct existing administration building & construct <br />addition for new administration /dining /kitchen space to meet <br />space standards. <br />• Provide more prominent front door and secure main entrance <br />• Renovate existing buildings. <br />CURRENT CONDITIONS: <br />• Magnet Spanish dual - language school <br />• Two mobile units on -site <br />• Kitchen, dining, & staff support areas are too small <br />• Existing reception area is in a large open lobby that is not secure <br />• Water infilitration issues in Building 5 <br />• Campus -style layout <br />• Aging mechanical system <br />Student Capacity (per SAPFO): 539 Students <br />2013 ADM: 491 Students <br />Construction: .d bearing CMU walls with brick veneer; <br />built-up roof over a poured-gypsum deck & pre-cast exterior wall <br />construction <br />