Orange County NC Website
• Provide an administration addition at front to provide necessary <br />staff space as well as a secure main entry <br />• Classroom wing deconstruction and addition at rear of the <br />school including I re-K classroom <br />• Enclose breezeways to connect all classrooms with interior <br />corridors <br />• Realign the parent drop -off and combine the bus loop with <br />Phillips Middle School to eliminate stacking on Estes Drive <br />• Connect internally most of the campus <br />• Eliminate mobile classrooms <br />• increase capacity by 58 seats <br />CURRENT CONDITIONS: <br />• Two mobile units on -site housing Pre-K and a science room <br />• Most classrooms are 28 to 33% smaller than the current School <br />Construction Standards program <br />• Program deficiencies, including 4 smaller classroom spaces, <br />administration and staff support spaces <br />• Classrooms in the 1957 building exit to exterior breezeways and <br />are not secure <br />• Aging mechanical system <br />• Queuing forces stacking in the Public right of way <br />Year Built: 1957 <br />Additions: 986 9 <br />Student Last Renovation: 2011 <br />Area: S8,442 <br />Acres: 33.1 <br />.. SAPFO): 527 Students <br />2013 ADM: Students <br />Construction- Loabrick <br />p roof over poured-gypsum <br />