Browse
Search
Agenda - 04-29-2014 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 04-29-2014 - Budget Work Session - Late
>
Agenda - 04-29-2014 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 12:13:59 PM
Creation date
4/28/2014 9:42:50 AM
Metadata
Fields
Template:
BOCC
Date
4/29/2014
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 04-29-2014
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHCCS Facilities Assessment Recommendations <br />CONSTRUCTION LIST <br />School Name <br />Scope of Work <br />Est. Cost <br />• Eliminates life safety issues in Building 100 by deconstruction <br />and building new academic wing <br />CARRBORO <br />• Provide a new administration suite & main entrance <br />$13.55M <br />ELEMENTARY <br />Moves queuing off of the road <br />• Increase capacity by 52 seats <br />• Deconstruct all of Building "A" <br />• Replaces oldest academic building with new <br />• Creates a new entry/ admin suite that is accessible and <br />CHAPEL HILL <br />secure <br />$52.41M <br />HIGH SCHOOL <br />• Addresses oldest building and major mechanical issues <br />• Connects more of the campus <br />• Increases capacity by 105 seats <br />• Renovate existing building <br />CULBRETH <br />• Construct small addition that provides new location for <br />$7.15M <br />MIDDLE <br />administration suite and provides secure main entrance <br />• Renovate & reorganize the layout of the main building <br />• Relocated the administration suite to the street front & <br />EPHESUS <br />provide a new main entry <br />$15.54M <br />ELEMENTARY <br />• Provide additional program space to eliminate mobiles & <br />bring school up to space standards <br />• Increase capacity by 137 <br />• Provide an administration addition at front to provide <br />necessary staff space as well as a secure main entry <br />• Classroom wing deconstruction and addition at rear of the <br />ESTES HILLS <br />school <br />$16.73M <br />ELEMENTARY <br />• Enclose breezeways to connect all classrooms with interior <br />corridors <br />• Provide new queuing configuration <br />• Increase capacity by 58 seats <br />• Deconstruct existing admin bldg & construct addition of <br />FRANK <br />admin /kitchen space to meet space standards <br />PORTER <br />• Provide more prominent front door and secure main <br />$9.45M <br />GRAHAM <br />ELEMENTARY <br />entrance <br />• Renovate existing buildings <br />0000,, IRDU CENTER DRIVE, S!UOTE 217, MORRISVIILLE, NC 27560 91M40.10091 FAX 91984U045 <br />M(-)Sll: :IC.EYARCIHIIITECTS.CO M <br />
The URL can be used to link to this page
Your browser does not support the video tag.