Orange County NC Website
RENA Community Center Pre-Bid Questions <br /> i Addenda#2—March 04,2014 <br /> 1. 1 am looking for the duration&liquidated damages for this project in the specs&I cannot seem to find either. <br /> Could you please help me with that? <br /> <Orange County Response>180 days,Contractor will be fined$100 a day for every day over 180 days. <br /> 2. 1 have been looking in the contract documents for information on temporary power and lighting and have been <br /> unable to locate the information.Can you please direct me to where I can find this information? <br /> <Orange County Response>Contractor's responsibility <br /> 3. Refer to Electrical Sheet E-101;Gen Note 2."Electrical conduits shall be routed underneath the slab where <br /> possible." Per our discussion at the Pre-Bid Conference,you indicated that conduit would not be allowed to run <br /> below slab. Please clarify what is allowed to be run below slab. <br /> <N+B Response>Conduits should run below slab wherever possible as stated on Electrical drawings. <br /> 4. Per discussion at the Pre-Bid Conference,you indicated that it would be acceptable to use MC cable in lieu of <br /> conduit.Please clarify if MC cable is acceptable and in which locations it may be used. I <br /> <N+B Response>MC cable is acceptable for branch circuiting. <br /> S. Will the following closets require a single shelf&rod or a full-height shelving unit with five shelves? <P+W <br /> Response> <br /> #02A=single shelf& rod <br /> #02B=single shelf& rod <br /> #05A=single shelf&rod <br /> #06A=single shelf,& rod <br /> #07A=single shelf& rod <br /> #07B=single shelf&rod <br /> #07C=single shelf& rod I <br /> i <br /> j <br /> I <br /> f <br /> i <br /> f <br /> r <br /> Page 2 of 2 <br /> t <br />