Browse
Search
2014-174 AMS - Riggs Harrod Builders Inc for Rogers Road Community Center Construction Agreement $552,488
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-174 AMS - Riggs Harrod Builders Inc for Rogers Road Community Center Construction Agreement $552,488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2014 12:20:02 PM
Creation date
4/23/2014 4:20:45 PM
Metadata
Fields
Template:
BOCC
Date
4/23/2014
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
7a
Document Relationships
Agenda - 04-01-2014 - 7a
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 04-01-2014 - Regular Mtg.
R 2014-174 AMS - Riggs-Harrod Builders Inc. for RENA Community Center Construction Agreement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[Departmental Use Only] m s <br /> TITLE RENA Community Center <br /> FY FY2012-13 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 1st day of <br /> April, 2014, by and between Riggs-Harrod Builders, Inc., (hereinafter called the "Contractor"), and Orange <br /> County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br /> "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named,agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and/or field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement with incorporated General Conditions. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and/or field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Perkins+Will Architects (Sheet Index, General <br /> Specifications Contents, General Conditions and Addendums #1, #2, and #3 described in <br /> Attachment 1 dated 2-14-2014 for addendum#1; 3-5-2014 for addendum#2; and 3-7-2-14 for <br /> addendum#3) <br /> b. Written specifications prepared by the Designer. <br /> c. Contractor Bid proposal dated March 13, 2014 described in Attachment 2 which fully <br /> describes the work to be performed, such work(hereinafter called the"Work"). <br /> d. Related documents listed under Section 2 above. <br /> Revised 1/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.