Browse
Search
2014-186 Planning - TischlerBise for Student generation rate study for both school systems $14,060
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-186 Planning - TischlerBise for Student generation rate study for both school systems $14,060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2014 9:58:04 AM
Creation date
4/16/2014 2:48:30 PM
Metadata
Fields
Template:
BOCC
Date
4/16/2014
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2014-186 Planning - TischlerBise for student generation rate study for both school systems
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIMEFRAME AND COST <br /> T/MEFRAME <br /> Time estimated for completion is 8 to 10 weeks, barring any significant issues with data collection. <br /> COST <br /> The cost for the above scope of work is$14,060. <br /> Proposed Cost for Orange County,NC(SGR Study) <br /> Total <br /> Hourly Rate $185 Hours Cost <br /> Task 1 Project Initiation/Data Collection 16 $2,960 <br /> Task 2 Evaluate Data And Derive Preliminary Student Generation Rates 40 $7,400 <br /> Task 3 Prepare Draft And Final Student Generation Rate Report 20 $3,700 <br /> TOTAL 76 $14,060 <br /> Please note: Price assumes the effort as described above does not involve excessive geocoding of data. <br /> While some level of"cleaning up" of the data is anticipated, if we encounter significant issues with the <br /> data files, we will work with the County to mitigate those issues (explore other ways/approaches to get <br /> the data to a usable format). A change in pricing will be necessary only if it is TischlerBise's responsibility <br /> to undertake significant data scrubbing. <br /> Per discussions with the County, the scope and cost does not include any onsite meetings/trips. If a <br /> meeting/trip is desired,the cost per trip is$2,200 (including direct costs). <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.