Orange County NC Website
• As part of this task, TischlerBise will evaluate the data to determine if there are adequate <br /> numbers of units in the sample. (E.g., Multifamily and single family attached may have to be <br /> combined for Orange County Schools if the sample size is too small.) <br /> • TischlerBise will also conduct an analysis using U.S. Census Public Use Microdata Sample (PUMS) <br /> data to cross-check the findings from the address-match approach. The PUMS analysis may be <br /> for a larger geographic area than the County,which will require calibration of the data to reflect <br /> conditions in the two school districts. <br /> • TischlerBise will identify if there are issues with the data, approach, etc., and communicate with <br /> County on the issues and recommendations to correct. <br /> • TischlerBise will calculate preliminary Student Generation Rates for each School District by type <br /> of housing unit and bedroom count(data permitting) as follows: <br /> Orange County Schools <br /> • Single family detached <br /> • Single family attached (to include duplexes) <br /> • Multifamily <br /> • Manufactured Homes <br /> Chapel Hill-Carrboro City Schools <br /> o Single family detached <br /> o Single family attached (to include duplexes) <br /> o Multifamily <br /> o Manufactured Homes <br /> Deliverable: Technical memo on Preliminary Student Generation Rates. <br /> TASK 3:PREPARE DRAFT AND FINAL STUDENT GENERATION RATE REPORT <br /> TischlerBise will prepare a draft report documenting the calculation of Student Generation Rates, which <br /> will incorporate feedback from the above task. After comments are received on the draft Report, <br /> TischlerBise will make mutually agreed upon changes and prepare the final report. <br /> Deliverable: Draft and Final reports on Student Generation Rates (approach, methodology, data <br /> used, results). <br /> 4 <br />