Browse
Search
2014-173 Planning - J F Wilkerson Contracting Company for Buckhorn Mebane Utilities Phase 2 Change Order #4 $421,500
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-173 Planning - J F Wilkerson Contracting Company for Buckhorn Mebane Utilities Phase 2 Change Order #4 $421,500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2014 2:55:19 PM
Creation date
4/11/2014 2:47:00 PM
Metadata
Fields
Template:
BOCC
Date
4/10/2014
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2014-173 Planning - J. F. Wilkerson Contracting Co. - Buckhorn Mebane Utilities Phase 2 Change Order #4
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kevin Lindley <br /> From: David Townsend <dtownsend @hobbsupchurch.com> <br /> Sent: Friday, November 08, 2013 12:47 PM <br /> To: Kevin Lindley <br /> Subject: DDDDDDDRAFT please call before I finish <br /> Kevin,following several discussions, I am determining best"ESTIMATE" of the rock for the sewer lines S-3 &S-1. I have <br /> made these two assumptions to accomplish this:first,the existing soil conditions on Lines S-1 V S-3 will be the same for <br /> all work.They appear to be the same however the rock is buried therefore they seem to be very consistent. Secondly, <br /> the actual ratio of rock encountered during excavation of the recently constructed line and the future line work will be <br /> consistent.The topography of the two lines appear similar supporting this fact. The contractor has install sewer <br /> line from Sta 0+00 to MH#53 (approx.4600 Lin. Ft.)and "hit" 6350 Cu.Yds. of rock. Based on the above statements, <br /> 4500 Cu.Yds.of rock will be needed to complete Line S-3.Also the construction of Line S-1 will need approximately 6000 <br /> CU.Yds.of rock.This could result in amount totallingf 17,000 Cu.Yds.of rock for the entire project.The original <br /> Construction Bids included 6338 Cu.Yds. of rock @ $60.00 per Cu.Yd.Therefore,there is a possible change order <br /> amount of 10,662 Cu.Yds. of rock for the entire Project. <br /> David Townsend III, PE <br /> Hobbs, Upchurch &Associates, P.A. <br /> PO Box 1737 <br /> 135 W. Connecticut Ave. <br /> Southern Pines, NC 28388 <br /> Office:910.692.5616 <br /> Fax:910.692.7342 <br /> Mobile:336.257.0274 <br /> dtownsend @hobbsupchurch.com <br /> dtownsend55 @triad.rr.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.