Orange County NC Website
Attachment 2 7 <br /> [Departmental Use Only] <br /> TITLE Orange CO MSW LF Closure <br /> FY 13-14 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT(hereinafter called "Agreement"),made as of the day <br /> of April, 2014, by and between T&K Construction LLC, (hereinafter called the "Contractor"), and Orange <br /> County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br /> "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner,for the consideration herein named,agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and/or field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement with incorporated General Conditions. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and/or field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by HDR Engineering Inc. of the Carolinas (S heet sets OOG- <br /> 01 <br /> - 03. OOC- - 07 dated February 2014, <br /> O1 7 F bruary and all related addendum as acknowledged in <br /> submitted proposal) <br /> b. Written specifications prepared by the Designer. <br /> c. T&K Construction LLC proposal dated March 25, 2014 which fully describes the work to be <br /> performed, such work(hereinafter called the"Work"). <br /> d. Related documents listed under Section 2 above. <br /> Revised 1/14 1 <br />