Orange County NC Website
fu-d6i Bid Tabulations Summary g <br />Orange County MSW Landfill Closure Bid <br />HQR Ertgiill rihq, lnC. Bids Received Tuesday March 25, 2014 at 3:00 pm <br />-Dr the GalrolInats <br />CONTRACTOR' <br />T & K Construction LLC <br />Southeast Environmental <br />Triangle Grading & pardn& <br />Thalia Construction Co. Inc. <br />Sargent Corporation <br />Rifenburg Construction Inc. <br />Contracting, Inc. <br />Inc. <br />ADDRESS: <br />235 County Road 1242 <br />5667 Val Out Rd <br />PO Drawer 2570 <br />900 NC 86 Neah <br />435 Bennoch Road PO Box <br />303 Highway 70 Bypass <br />Vinemont AL 35179 <br />Hahira, GA 31632 <br />0udington, NC 27215 <br />Hillsborough NC 27278 <br />Stillwater, ME 04489 <br />Durham, NC 27703 <br />LICENSE 4: <br />55999 <br />41556 <br />17456 <br />35203 <br />65779 <br />37580 <br />Item <br />Cost Rank <br />Cost Rank <br />Cost Rank <br />Cost <br />No. Descri tign unit <br />Rank <br />Cost Rank <br />Cost Rank <br />Base Bid LS <br />$ 3,340,600 1 <br />$ 3,544,000 2 <br />$ 3,687,539 3 <br />$ 3,847,698 4 <br />$ 4,209,400 5 <br />$ 6,155,378 6 <br />Bid Altemative No. 1 LS <br />S 3,766,600 1 <br />$ 4,740,000 4 <br />$ 4,679,033 3 <br />$ 4,360,687 2 <br />$ 4,980,300 5 <br />$ 6,130,378 6 <br />Bid Alternative No. 2 LS <br />$ 3,543,100 1 <br />$ 3,822,000 2 <br />$ 4,057,369 4 <br />$ 3,996,777 3 <br />$ 4,369,125 5 <br />$ 6,655,378 6 <br />Unit Cost Items <br />Unit Cost <br />Unit Cost <br />Unit Cost <br />Unit Cost <br />Unit Cast <br />Unit Cost <br />1 Supply and Install 5o11 Cushion Layer (obtained orelte including any processingreq uired BY <br />$ 3.20 <br />$ 4.00 <br />$ 6.50 <br />$ 8.00 <br />$ 4.90 <br />$ 12.00 <br />to meet project specifications) <br />2 Supplyand Install 5o11 Cushion Layer(obtained aff- siteincuding anyprocessingrequired BY <br />$ 3.99 <br />$ 7.50 <br />$ 13.00)$ <br />10.00 <br />$ 810 <br />$ 15.00 <br />to meet project specifications) <br />3 Supply and install Topsoil Layer (obtained on- site includingany processing required to BY <br />$ 2.28 <br />$ 3.00 <br />$ 2.55 <br />$ 8.00 <br />$ 2.10 <br />$ 3.85 <br />meet project specifications) <br />4 Supply and Install Topsoil Layer (obtained off -site including any processing required to BY <br />$ 6.27 <br />$ 8.50 <br />$ BAB <br />i $ 10.00 <br />$ 3.25 <br />$ 9.00 <br />meet project specifications) <br />S Supplyand Install Landfill Gas System Extensions LS <br />$ 59,052.00 <br />$ 68,750.00 <br />$ 45,875.00 <br />$ 30,000.00 <br />$ 24,025.00 <br />$ 45,000.00 <br />6 Supplq and Install LarMfill Gas System Boats LS <br />$ 26,790.00 <br />$ 10,90000 <br />$ 27,500.00 <br />$ 12,675.00 <br />$ 11,550.00 <br />$ 37,000001 <br />7 Excavate, Dispose, and eackfill Waste CY <br />$ 9.12 <br />$ 9.00 <br />$ 29.15 <br />$ 23.50 <br />$ 26.60 <br />$ 50.09 1 <br />8 Supply and Install Additional intermediate Cover /General Fll /Structural Fill (obtained on- CY <br />$ 7.76 <br />$ 4.00 <br />$ 15.90 <br />$ 15.00 <br />$ 7.40 <br />$ 25.001 <br />site including any processing required to meet project spec fications) <br />9 Leachate Collection System Cleaning and Videotaping LS <br />$ 5,700.00 <br />$ 36,315.00 <br />$ 38,000.00 <br />$ 34,000.00 <br />$ 32,260.00 <br />$ 47,000.00 <br />10 Additional cast to sad, with Carthage Switch ra instead of edfied mixture. AC <br />$ 1,026.00 <br />$ 200.00 <br />$ 500.00 <br />$ 400.00 <br />$ 240.00 <br />$ 500.00' <br />All Addenda Acknowledged <br />4 Addenda Acknowledged <br />4 Addenda Acknowledged <br />4 Addenda Acknowledged <br />4 Addenda Acknowledged <br />4 Addenda Acknowledged <br />4Addenda Acknowledged <br />Identification of HUB Certified /Minority Business Participation <br />Included <br />included <br />Included <br />Included <br />Included <br />Included <br />State of NC MBE Affidavit A or 8 <br />Included <br />included' <br />induced <br />Included <br />Included° <br />Included <br />5u1contractor and Supplier Tabulation <br />Included <br />Not included* <br />Included <br />Included <br />Included <br />Included <br />Qualification Statement <br />Included <br />included <br />Not included- <br />Included <br />Included <br />Not included' <br />Contractor Safety Record <br />Included <br />induded <br />Included <br />Included <br />Included <br />Included <br />EA Bond <br />Included <br />Included <br />Included <br />Included <br />Included <br />I Included <br />Irregularities (see highlighted areas on lorml* <br />*Crossed out "North <br />*Crossed out "North <br />Carolina" and put "Georgia' <br />Carolina" and put "Maine" in <br />in the title <br />I <br />Orange County MSW Landfill Closure Bid Tab.xlsx Page 1 of 1 3/31/2014 <br />