fu-d6i Bid Tabulations Summary g
<br />Orange County MSW Landfill Closure Bid
<br />HQR Ertgiill rihq, lnC. Bids Received Tuesday March 25, 2014 at 3:00 pm
<br />-Dr the GalrolInats
<br />CONTRACTOR'
<br />T & K Construction LLC
<br />Southeast Environmental
<br />Triangle Grading & pardn&
<br />Thalia Construction Co. Inc.
<br />Sargent Corporation
<br />Rifenburg Construction Inc.
<br />Contracting, Inc.
<br />Inc.
<br />ADDRESS:
<br />235 County Road 1242
<br />5667 Val Out Rd
<br />PO Drawer 2570
<br />900 NC 86 Neah
<br />435 Bennoch Road PO Box
<br />303 Highway 70 Bypass
<br />Vinemont AL 35179
<br />Hahira, GA 31632
<br />0udington, NC 27215
<br />Hillsborough NC 27278
<br />Stillwater, ME 04489
<br />Durham, NC 27703
<br />LICENSE 4:
<br />55999
<br />41556
<br />17456
<br />35203
<br />65779
<br />37580
<br />Item
<br />Cost Rank
<br />Cost Rank
<br />Cost Rank
<br />Cost
<br />No. Descri tign unit
<br />Rank
<br />Cost Rank
<br />Cost Rank
<br />Base Bid LS
<br />$ 3,340,600 1
<br />$ 3,544,000 2
<br />$ 3,687,539 3
<br />$ 3,847,698 4
<br />$ 4,209,400 5
<br />$ 6,155,378 6
<br />Bid Altemative No. 1 LS
<br />S 3,766,600 1
<br />$ 4,740,000 4
<br />$ 4,679,033 3
<br />$ 4,360,687 2
<br />$ 4,980,300 5
<br />$ 6,130,378 6
<br />Bid Alternative No. 2 LS
<br />$ 3,543,100 1
<br />$ 3,822,000 2
<br />$ 4,057,369 4
<br />$ 3,996,777 3
<br />$ 4,369,125 5
<br />$ 6,655,378 6
<br />Unit Cost Items
<br />Unit Cost
<br />Unit Cost
<br />Unit Cost
<br />Unit Cost
<br />Unit Cast
<br />Unit Cost
<br />1 Supply and Install 5o11 Cushion Layer (obtained orelte including any processingreq uired BY
<br />$ 3.20
<br />$ 4.00
<br />$ 6.50
<br />$ 8.00
<br />$ 4.90
<br />$ 12.00
<br />to meet project specifications)
<br />2 Supplyand Install 5o11 Cushion Layer(obtained aff- siteincuding anyprocessingrequired BY
<br />$ 3.99
<br />$ 7.50
<br />$ 13.00)$
<br />10.00
<br />$ 810
<br />$ 15.00
<br />to meet project specifications)
<br />3 Supply and install Topsoil Layer (obtained on- site includingany processing required to BY
<br />$ 2.28
<br />$ 3.00
<br />$ 2.55
<br />$ 8.00
<br />$ 2.10
<br />$ 3.85
<br />meet project specifications)
<br />4 Supply and Install Topsoil Layer (obtained off -site including any processing required to BY
<br />$ 6.27
<br />$ 8.50
<br />$ BAB
<br />i $ 10.00
<br />$ 3.25
<br />$ 9.00
<br />meet project specifications)
<br />S Supplyand Install Landfill Gas System Extensions LS
<br />$ 59,052.00
<br />$ 68,750.00
<br />$ 45,875.00
<br />$ 30,000.00
<br />$ 24,025.00
<br />$ 45,000.00
<br />6 Supplq and Install LarMfill Gas System Boats LS
<br />$ 26,790.00
<br />$ 10,90000
<br />$ 27,500.00
<br />$ 12,675.00
<br />$ 11,550.00
<br />$ 37,000001
<br />7 Excavate, Dispose, and eackfill Waste CY
<br />$ 9.12
<br />$ 9.00
<br />$ 29.15
<br />$ 23.50
<br />$ 26.60
<br />$ 50.09 1
<br />8 Supply and Install Additional intermediate Cover /General Fll /Structural Fill (obtained on- CY
<br />$ 7.76
<br />$ 4.00
<br />$ 15.90
<br />$ 15.00
<br />$ 7.40
<br />$ 25.001
<br />site including any processing required to meet project spec fications)
<br />9 Leachate Collection System Cleaning and Videotaping LS
<br />$ 5,700.00
<br />$ 36,315.00
<br />$ 38,000.00
<br />$ 34,000.00
<br />$ 32,260.00
<br />$ 47,000.00
<br />10 Additional cast to sad, with Carthage Switch ra instead of edfied mixture. AC
<br />$ 1,026.00
<br />$ 200.00
<br />$ 500.00
<br />$ 400.00
<br />$ 240.00
<br />$ 500.00'
<br />All Addenda Acknowledged
<br />4 Addenda Acknowledged
<br />4 Addenda Acknowledged
<br />4 Addenda Acknowledged
<br />4 Addenda Acknowledged
<br />4 Addenda Acknowledged
<br />4Addenda Acknowledged
<br />Identification of HUB Certified /Minority Business Participation
<br />Included
<br />included
<br />Included
<br />Included
<br />Included
<br />Included
<br />State of NC MBE Affidavit A or 8
<br />Included
<br />included'
<br />induced
<br />Included
<br />Included°
<br />Included
<br />5u1contractor and Supplier Tabulation
<br />Included
<br />Not included*
<br />Included
<br />Included
<br />Included
<br />Included
<br />Qualification Statement
<br />Included
<br />included
<br />Not included-
<br />Included
<br />Included
<br />Not included'
<br />Contractor Safety Record
<br />Included
<br />induded
<br />Included
<br />Included
<br />Included
<br />Included
<br />EA Bond
<br />Included
<br />Included
<br />Included
<br />Included
<br />Included
<br />I Included
<br />Irregularities (see highlighted areas on lorml*
<br />*Crossed out "North
<br />*Crossed out "North
<br />Carolina" and put "Georgia'
<br />Carolina" and put "Maine" in
<br />in the title
<br />I
<br />Orange County MSW Landfill Closure Bid Tab.xlsx Page 1 of 1 3/31/2014