Browse
Search
Agenda - 04-15-2014 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 04-15-2014 - Regular Mtg.
>
Agenda - 04-15-2014 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 11:55:13 AM
Creation date
4/11/2014 12:28:43 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2014
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 04-15-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
58 <br /> manner. All costs and charges incurred by the Owner in proceeding in accordance with the <br /> preceding sentence, including attorney's fees, and all costs incurred by the Owner in completing <br /> the Work shall be deducted from any money due or which becomes due the Contractor. If such <br /> costs and expenses incurred by the Owner shall be less than the sum which would have been <br /> payable under Contract Documents if it had been completed by the Contractor, then the <br /> Contractor shall be entitled to receive the difference, but if such costs and expenses shall <br /> exceed the sum which would have been payable under the Contract Documents, the Contractor <br /> and the Contractor's surety shall be liable to the Owner for and shall pay to the Owner the <br /> amount of such excess. <br /> ARTICLE 34. TERMINATION OR SUSPENSION BY THE OWNER FOR CONVENIENCE <br /> 34.1 The Owner may, without cause, order the Contractor to terminate, suspend, delay, or <br /> interrupt the Work in whole or in part for such period of time as the Owner may determine. <br /> 34.2 If the Contractor is subsequently ordered by the Owner to resume the Work, any cost or <br /> expenses to which the Contractor may be entitled by reason of the suspension, delay, or <br /> interruption shall be recovered by means of a Change Order in accordance with Articles 13 and <br /> 14 hereof and the Contract Construction Schedule shall be adjusted in accordance with Article <br /> 13 hereof. <br /> 34.3 In the event of termination by the Owner under this Article, the Contractor shall be entitled <br /> to receive the reasonable and documented direct costs incurred prior to termination, including <br /> the cost of materials purchased for the Work which purchases cannot be canceled or which <br /> material cannot reasonably be used by the Contractor on other work, and the cost of closing <br /> down the Project in a safe and efficient manner, plus ten percent (10%) thereof for overhead <br /> and profit, subject to the following conditions: <br /> a) When the Contract is terminated before completion of all items of Work, payment shall be <br /> made for the actual number of units or items of Work completed at the applicable contract <br /> prices, or as mutually agreed for items of Work partially complete. If a mutual agreement cannot <br /> be reached, the Owner shall have the authority to make such equitable adjustment as it deems <br /> warranted and the Final Payment shall be made accordingly. <br /> b) Reimbursement for organization of any Work and moving equipment to and from the job shall <br /> be considered when not otherwise provided for in the Contract Documents where the volume of <br /> completed Work is too small to compensate the Contractor for those expenses under unit <br /> prices. If a mutual agreement cannot be reached, the Owner will have the authority to make <br /> such equitable adjustments as it deems warranted and the Final Payment will be made <br /> accordingly. <br /> c) Materials obtained by the Contractor for the Work that have been inspected and accepted by <br /> the Designer and that are not incorporated in the Work shall, at the request of the Contractor, be <br /> purchased from the Contractor at the Contractor's actual cost as shown by receipted bills and <br /> actual costs records at such points of delivery as may be determined by the Owner. <br /> d) No payment shall be made by Owner to Contractor except as herein above provided. No <br /> claim for loss of anticipated profits shall be considered or allowed. <br /> Revised 9/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.