Orange County NC Website
39 <br /> 1 Hours of Operation <br /> 2 Groundwater usage <br /> 3 Building size <br /> 4 Minimum lot size <br /> 5 In addition to all requirements in the UDO <br /> 6 <br /> 7 Permitted Outright vs. SUP or Conditional Zoning <br /> 8 Less intensive uses added to the Table of Permitted Uses as permitted outright <br /> 9 (example for AR zoning district; other zoning districts are also affected) <br /> 10 Subject to use-specific and general development standards <br /> 11 Community Agricultural Processing Facility <br /> 12 Community Farmers Market <br /> 13 Cooperative Farm Stand <br /> 14 Community Meat Processing Facility <br /> 15 Non-Farm Use of Farm Equipment <br /> 16 Rural Special Events <br /> 17 Check "Definitions" to see how these uses are defined <br /> 18 Staff approval <br /> 19 More intensive uses must be permitted through either the Special Use Permit process or <br /> 20 rezoned as an ASE-CZ <br /> 21 Class B Special Use Permit (in AR zoning district): <br /> 22 Microbrewery with Minor Events <br /> 23 Taxidermy <br /> 24 Winery with Minor Events <br /> 25 Microbrewery, Production Only <br /> 26 Winery, Production Only <br /> 27 • Veterinary Clinic <br /> 28 • Veterinary Clinic, mobile <br /> 29 Rural Heritage Museum <br /> 30 Class A Special Use Permit (in AR zoning district): <br /> 31 Equestrian Center <br /> 32 Special Use Permits are "quasi-judicial" proceedings <br /> 33 Public Hearing <br /> 34 Decided on a case-by-case basis with public input ("evidence") <br /> 35 <br /> 36 Conditional Zoning District (ASE-CZ) <br /> 37 Conditional zoning districts allow projects to be considered on a case-by-case, site- <br /> 38 specific basis <br /> 39 Rezoning (legislative process) with public hearing <br /> 40 Acknowledges that there are places where a specific type of use may be appropriate <br /> 41 whereas it would not be in a different site-specific situation <br /> 42 BOCC has final decision on whether a proposed use(s) is compatible with <br /> 43 surrounding uses <br /> 44 Mutually agreed upon conditions can be imposed as part of the approval process <br /> 45 • Allows tailoring of project to a specific site <br /> 46 Table of Permitted Uses lists the types of uses that can be applied for as an ASE-CZ <br /> 47 <br /> 48 Change in groundwater usage standard language <br /> 49 Proposed language in amendment package: <br /> 50 A comprehensive groundwater study, for facilities expected to use more than 240 <br /> 51 gallons of groundwater per day per acre of lot area. Said study shall detail: <br />