Browse
Search
Agenda - 04-15-2014 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 04-15-2014 - Regular Mtg.
>
Agenda - 04-15-2014 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2014 11:44:56 AM
Creation date
4/11/2014 11:43:58 AM
Metadata
Fields
Template:
BOCC
Date
4/15/2014
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 04-15-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> 1 This is a project just completed in Orange County. This is the White Cross Solar Farm. This <br /> 2 gives you an idea of—that's just a pretty good perspective of what panels look like and how we <br /> 3 follow the existing contours. I feel like that's been very positively received in the County -The <br /> 4 White Cross Solar Farm. The panels are polycrystalline silicon photovoltaic cell panels. As you <br /> 5 just saw, they are flat blue in color. Sun hits the panels, hits really what is very similar to <br /> 6 computer chip material, and that creates a small amount of DC current. Each one of those <br /> 7 panels is like a giant tributary. It's sort of like water coming down a mountain. The DC current <br /> 8 accumulates in this tributary system. It's converted to AC current in each one of these inverters <br /> 9 and then the transformers convert it to exactly the same power that's in the Duke Energy local <br /> 10 lines. This is a completely passive system. There is not fuel; there is no waste; no emissions; <br /> 11 no noise; no moving parts; no operator. It's a truly passive renewable energy system. <br /> 12 <br /> 13 We are required to obtain, from the North Carolina utility commission, a certificate of public <br /> 14 necessity and convenience for each plant. We've obtained probably 70 of these at this point. <br /> 15 And it is the policy— it is the public policy of the state of North Carolina to promote renewable <br /> 16 energy. The power is sold to Duke Power under a long term 20 year power purchase <br /> 17 agreement contract. That contract is also regulated by the utility commission, and the projects <br /> 18 are financed through a combination of tax credit investors and the income from these power <br /> 19 purchase agreements. We will of course obtain all necessary DEANR permits, DOT permits <br /> 20 and a local electrical permit. We don't usually get a building permit, because we don't really do <br /> 21 any construction. The project will not impact municipal services, schools, utilities. A typical <br /> 22 project is surrounded by either the installed buffers Mr. Harvey spoke about, or has existing <br /> 23 buffers, and those buffers are generally subject to conditions that you all could set. At the end <br /> 24 of the 20 or 30 years, if the project is extended, they are easily removed, and the site is put back <br /> 25 to —close to - its original condition, and in general, the salvage value exceeds the removal. <br /> 26 <br /> 27 This - I think Mr. Harvey had a better map—shows the location of the project, and it's <br /> 28 surrounded by a variety of uses - I believe within the center—in a long range plan area- <br /> 29 designated area for commercial development. These are some of the uses around the facility <br /> 30 and things that we think create a similar impact- a large scale single family residential <br /> 31 development; a manufacturing facility; warehouse; there is a public works facility adjacent to the <br /> 32 site; a large school facility. Mr. Kirkland will speak in more detail about this, but solar farms are <br /> 33 low impact developments. They create no noise, no emission, no odor, no hazardous materials <br /> 34 and almost no traffic—one trip a month to maintain the site. They are much lower in height, <br /> 35 traffic, noise, light, etc. than most other development. They are literally dark at night. We don't <br /> 36 propose any lighting on this sight. It is a passive use and it generally harmonizes with adjacent <br /> 37 uses and it establishes the certainty of a long term, low intensity use. Our engineers will speak <br /> 38 to the following issues in general. This project will not endanger the public health or safety. The <br /> 39 project will meet all of your codes. The project will generate less than trip per month, and no <br /> 40 utilities are required or used. <br /> 41 <br /> 42 In conclusion, these are your general SUP conditions, and we would just like to close by saying <br /> 43 that we feel like we are going to present evidence that we meet all three of these conditions. <br /> 44 The use will maintain or promote the public health, safety and general welfare. The use will <br /> 45 maintain or enhance the value of contiguous property, and the use is a public necessity. And <br /> 46 the location and character of the use is in harmony with the area, and in compliance with your <br /> 47 comprehensive plan. Thank you very much. If you have any questions, I would be glad to <br /> 48 answer them. <br /> 49 <br /> 50 Dave Neill: Mr. Iannone, in the Board's package, under tab one is a document titled, Affidavit of <br /> 51 Louis Iannone. Is this your statement? <br />
The URL can be used to link to this page
Your browser does not support the video tag.