Browse
Search
Agenda - 04-10-2014 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 04-10-2014 - Budget Work Session
>
Agenda - 04-10-2014 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2014 8:01:00 AM
Creation date
4/7/2014 10:34:06 AM
Metadata
Fields
Template:
BOCC
Date
4/10/2014
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 04-10-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> Hillsborough EDD - reflects funds of $150,000 in Year 1 for design and easement purchase, <br /> and $1,000,000 in year 2 (FY 2015-16) for construction of water and sewer infrastructure in this <br /> EDD. Note: this project has moved up several years due to projected growth and economic <br /> activity in the Hillsborough EDD area. <br /> Eno EDD - includes $1,750,000 in Year 5 (FY 2018-19) for the construction work in this EDD. <br /> Note: based on recent feasibility studies to provide sewer service to this area, this project has <br /> been pushed back several years from the current CIP. <br /> Buckhorn-Mebane EDD Phases 3 and 4 - includes $2,500,000 in Year 3 (FY 2016-17) for the <br /> Buckhorn-Mebane Phases 3 and 4 construction projects. Note: this project has been moved <br /> back one year from the current CIP to allow for the completion of Phase 2 prior to starting <br /> Phases 3 and 4. <br /> The Water & Sewer section also includes two (2) new projects in Years 1 and 2 that were not <br /> part of the FY 2013-18 CIP. These projects include the following: <br /> Economic Development Infrastructure — this project reflects the FY 2013-14 funding of <br /> infrastructure for the Morinaga Company, which consists of design for the extension of water, <br /> sewer and roadway infrastructure to the site from surrounding existing utility system and <br /> construction of the water and sewer extension. This project is funded by $250,000 from Article <br /> 46 Sales Tax proceeds, and $750,000 in CDBG funds. This new project also includes $50,000 <br /> in Year 1 for EDD zones right-of-way-accesses, and $50,000 in Year 1 for public-private <br /> participation in EDD zones and rural broadband related access. <br /> Economic Development Utility Extension Project(s) — provides funds of $250,000 in Years 1 and <br /> 2 for future economic development projects that are currently being considered, but have not <br /> been finalized. If no project develops in the coming year, which requires utility extension, the <br /> funds would be available for future years as needed. <br /> Solid Waste: <br /> Sanitation - includes funds of $2,428,283 in Year 1 (FY 2014-15) for Solid Waste Convenience <br /> Center (SWCC) improvements at the Eubanks Road site (the cost has increased by <br /> approximately $1.1 million from the current FY 2013-18 CIP due to the movement of the scale <br /> house operations and associated site improvements, extending water and sewer to the site, <br /> additional stormwater structures, purchase of two additional stationary compactors, and a larger <br /> household hazardous waste building). Year 1 also includes $206,944 for the replacement of a <br /> Hook Lift truck; Year 2 includes $495,000 for SWCC improvements at the High Rock Road site; <br /> and Year 3 includes $340,000 for SWCC improvements at the Ferguson Road site. Years 6-10 <br /> includes $212,028 for SWCC improvements at the Bradshaw Quarry site. <br /> Recycling Operations — the current FY 2013-14 includes the purchase of 2 rural curbside trucks <br /> and the purchase of 19,500 urban recycling carts, at a total cost of $1,602,139. Year 1 (FY <br /> 2014-15) provides for the purchase of 7,000 rural carts, as well as the replacement of two <br /> trucks. Year 2 (FY 2015-16) provides for the purchase of 2,000 additional rural carts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.