Orange County NC Website
7 <br /> 6-10 of the Recommended CIP, and will continue the use of the Environment and <br /> Agricultural Center (EAC) on Revere Road, either in its current state, an adaptive re-use <br /> of the facility, or deconstruction/new facility construction. Staff will provide additional <br /> information, including cost estimates, related to these potential options at the April 10th <br /> meeting. Funding of $1,432,508 for replacement of the roof, HVAC equipment, and <br /> parking lot improvements to the EAC is currently included in FY 2017-18). <br /> Revised CIP project pages for these two projects, as well as any other project changes <br /> directed by the BOCC at this meeting, will be provided in preparation for the May 15,2014 <br /> CIP work session. <br /> Eurosport Soccer Center (Phase 11) — This represents an investment in the current facility, with <br /> $141,000 included in Year 1 (FY 2014-15) for restrooms and other current facility <br /> improvements; $425,000 in Year 3 (FY 2016-17) for possible land acquisition for future <br /> expansion; and $4.6 million in Years 6-10 for the construction of new artificial turf fields, <br /> parking, restrooms/equipment building, equipment, and stormwater controls. <br /> Lands Legacy Program — includes $2.4 million over a two-year period ($400,000 in Year 1 and <br /> $2,000,000 in Year 2) for continued conservation and protection of the County's most critical <br /> natural and cultural resources. Note: Prior 2001 Bond authorization of $2.4 million lapsed in <br /> 2010, so new financing is recommended in Years 1 and 2. <br /> Millhouse Road Park — The recommended budget for this project reflects a possible Town of <br /> Chapel Hill/County partnership concept for this project. Funds of $100,000 for design, <br /> engineering, and preconstruction costs are recommended in Year 3 (FY 2016-17), with Park <br /> construction funds of $6,400,000, including a soccer field complex, walking trails, and other <br /> amenities, in Year 4 (FY 2017-18). Note: this project has been pushed back two years from <br /> the current CIP to be consistent with the Town's Parks and Recreation Master Plan. <br /> Special Revenue Projects (Article 46 Sales Tax Proceeds) — Highlights <br /> The Special Revenue section includes anticipated revenue from the Article 46 (1/4 cent) Sales <br /> Tax, with 50% of the proceeds for Economic Development initiatives and 50% for Education <br /> (allocated by the ADM count of the two school districts). In FY 2013-14, proceeds are <br /> estimated at $2,732,000, with 1.5% growth assumed in subsequent years. A summary is <br /> provided within the Special Revenue Projects section of the document listing the recommended <br /> uses of these proceeds. <br /> Proprietary Projects — Highlights <br /> Water & Sewer Utilities: <br /> Buckhorn EDD — Phase 2 Extension (Efland Sewer to Mebane) - reflects funds of $4,300,000 in <br /> Year 1 (FY 2014-15) for construction of this project; this represents an increase in previous <br /> anticipated costs due to revised estimates for design and construction; this continues to fit into <br /> the long range strategy to ultimately turn over the operation of the Elfand sewer system to the <br /> Town of Mebane. <br />