Orange County NC Website
6 <br /> Court Street Annex — includes $100,000 in Years 6-10 for the replacement of the main <br /> distribution panel and electrical circuits throughout the building to meet modern standards. <br /> Other Major County projects include the following: <br /> Cedar Grove Community Center— includes $2,000,000 in Year 1 (FY 2014-15) for construction <br /> and adaptive reuse of the former Northern Human Services Center. Final Board decisions <br /> regarding use or disposition of the classroom wings will determine the finalized design and cost <br /> estimates for the project. <br /> Southern Orange Campus (Future Planning) — Design services of $400,000 are included in <br /> Year 1 (FY 2014-15), with site development infrastructure work of $3,600,000 in Year 2 (FY <br /> 2015-16) for campus buildings not associated with the existing Southern Human Services <br /> Center (SHSC). Expansion of the existing SHSC is included in a separate CIP project. <br /> Southern Human Services Center Expansion — includes expansion of the existing SHSC, <br /> contingent upon approval of the Special Use Permit (SUP) modification that will guide use of <br /> this site. Funding of $6,650,000 is included in Year 3 (FY 2016-17) for this expansion, which <br /> includes a Dental Clinic. <br /> Southern Branch Library — funding of $600,000 was approved in FY 2013-14 for possible land <br /> purchase; Design and engineering work of $525,000 is included in Year 2 (FY 2015-16), and <br /> construction costs of $7,000,000 and $755,000 in equipment and furnishings are included in <br /> Year 3 (FY 2016-17). Note: this project moves up one year from the current CIP. <br /> Proposed Jail — total project costs of $30,000,000, with site related planning costs of $500,000 <br /> recommended in Year 2 (FY 2015-16), architectural/engineering costs of $500,000 in Year 3 <br /> (FY 2016-17), with the construction of a new 250 bed jail recommended in Year 4 (FY 2017-18) <br /> at an estimated cost of$29,000,000. <br /> Emergency Services Substations - funding for this project will enable the construction of 4 new <br /> co-built EMS stations and 2 stand-alone substations in geographical areas across the County <br /> that will help reduce response times, which averaged 9:45 at the end of 2013. Year 2 (FY <br /> 2015-16) includes $1.2 million for 2 co-builds, one with the Town of Chapel Hill in the Glen <br /> Lennox area, and one with the Town of Hillsborough in the Waterstone development area. <br /> Year 3 (FY 2016-17) includes $1.2 million for 2 additional co-builds, one with the Town of <br /> Chapel Hill in the Weaver Dairy/MLK area or Franklin Street/Elliott Road area, and one with the <br /> Town of Hillsborough in a northern location yet to be identified. Also, includes $1.5 million in <br /> Year 5 (FY 2018-19) and in Years 6-10 for stand-alone substations. Note: there is a map of <br /> the current and proposed substations included in the CIP document. <br /> Blackwood Farm Park — includes $147,400 in Year 1 (FY 2014-15) for amenities such as trail <br /> construction, parking, restrooms, dock, signage, disc golf, and security cameras. Park <br /> construction is included in Year 4 (FY 2017-18), with $5.6 million for the construction of an <br /> Agricultural, Environment, and Parks Center, including a permanent parks operations base, <br /> included in Years 6-10, pending final decisions from the Board regarding the Space Needs <br /> Analysis Study. (NOTE: As per direction from the BOCC at their March 11, 2014 work <br /> session related to the Space Needs Study, staff will remove funding for a new <br /> Agricultural, Environment, and Parks Center at Blackwood Farm Park, currently in Years <br />