Orange County NC Website
30 <br /> RENA Community Center Pre-Bid Questions <br /> Addenda#2—March 04,2014 <br /> l. | am looking for the duration & liquidated damages for this project in the specs &| cannot seem to find either. <br /> Could you please help me with that? <br /> <O,unge County Rooponme> 1OA days, Contractor will befined$1&Ao day for every day over 100days. <br /> Z. 1 have been looking in the contract documents for information on temporary power and lighting and have been <br /> unable to locate the information. Can you please direct metowhere |can find this information? <br /> <Orange County Response »Contractor's responsibility <br /> 3. Refer to Electrical Sheet E-101;Gen Note 2. "Electrical conduits shall be routed underneath the slab where <br /> possible." Per our discussion at the Pre-Bid Conference,you indicated that conduit would not be allowed to run <br /> below slab. Please clarify what io allowed tobe run below slab. <br /> <N+B Response>Conduits should run below slab wherever possible as stated on Electrical drawings, <br /> 4. Per discussion at the Pre-Bid Conference,you indicated that it would be acceptable to use IVIC cable in lieu of <br /> conduit. Please clarify ifK8Ccable is acceptable and in which locations it maybe used. <br /> <N+ORaopnnse> K4C cable is acceptable for branch circuiting. <br /> S. Will the following closets require a single shelf&rod or a full-height shelving unit with five shelves? <P+W <br /> meaponxe> <br /> #02A=single shelf& rod <br /> #O2B =single shelf& rod <br /> #05A=single shelf& rod <br /> #06A=single shelf& rod <br /> #07/\=single shelf& rod <br /> #O7Q=single shelf& rod <br /> #07C=single shelf& rod <br /> Page 2 of 2 <br />