Browse
Search
Agenda - 04-01-2014 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 04-01-2014 - Regular Mtg.
>
Agenda - 04-01-2014 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 11:48:41 AM
Creation date
3/31/2014 9:16:05 AM
Metadata
Fields
Template:
BOCC
Date
4/1/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
2014-174 AMS - Riggs Harrod Builders Inc for Rogers Road Community Center Construction Agreement $552,488
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2014
Minutes 04-01-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> roof design; 3) more conventional heating and cooling systems; and 4) standard building <br /> materials and components such as windows, exterior siding, and kitchen equipment. <br /> Attachment 1, "Presentation", illustrates the main components and renderings of the facility <br /> design. Mr. Lebeau will present during the meeting to provide an overview of the design to the <br /> Board and answer questions. <br /> Competitive bids from ten (10) firms were opened on March 13, 2014. After a period of review <br /> of the bid documents by County staff and the project designer, Riggs-Harrod Builders, Inc. of <br /> Durham, NC was determined to be the lowest responsive, responsible bidder for this project <br /> (see Attachment 2, "Certified Bid Tabulation"). Attachment 3, "Construction Agreement", is the <br /> document prepared by the County Attorney that will govern the project if and when the Board <br /> authorizes the Chair to sign the Agreement. <br /> Should the Board of County Commissioners award the bid, the projected construction period is <br /> eight (8) months. Depending upon construction progress, management of unforeseen <br /> conditions and the facility commissioning process, the center may be available before the end <br /> of the 2014 calendar year. <br /> Both the Ground Lease with Habitat for Humanity and the Operating Agreement with the <br /> Rogers Eubanks Neighborhood Association have been approved by the Board of County <br /> Commissioners. <br /> FINANCIAL IMPACT: The BOCC has approved $650,000 for this project as part of the <br /> FY2012-13 Capital Investment Plan. Expenditures for this project are as follows: <br /> Construction Materials Testing Services $37500 <br /> Construction $5527488 <br /> Owner Costs — Site, Furniture, Kitchen $337900 <br /> Equipment Cabinet <br /> Owner Costs — Orange Water and Sewer $507103 <br /> Authority Utility Connection Fees <br /> Owner Contingency and Unforeseen Conditions $207000 <br /> Total $650,000 <br /> RECOMMENDATION(S): The Manager recommends the Board: <br /> 1) Award a bid to Riggs-Harrod Builders, Inc. of Durham, North Carolina in the amount of <br /> $552,488 for the construction of the Rogers Eubanks Neighborhood Association <br /> Community Center; <br /> 2) Authorize the Chair to sign the necessary paperwork upon final approval of the County <br /> Attorney; and <br /> 3) Authorize the County Manager to execute change orders for the project up to the project <br /> budget. <br />
The URL can be used to link to this page
Your browser does not support the video tag.