Orange County NC Website
All, <br /> Here is a proposed revision to the Commemorative Plaque Policy that I am suggesting for <br /> consideration tonight. I did discuss the changes with the Manager to make sure they were <br /> technically correct. The changes from the version in the agenda packet include the following: <br /> In section 2-a-ii - To the list of characteristics included on the plaque are added the date and <br /> the names of any former Commissioners in office at the time the project was approved. <br /> Deleted is the reference to unveiling, since staff said that was acceptable. <br /> In sections 2-b-ii and 2-c-ii, it is indicated that the size would be approximately 24" x 24" or <br /> larger (if appropriate). <br /> Alice Gordon <br /> Given below is the revised commemorative plaque policy, with the changes approved by the <br /> Board. These changes include the revisions proposed by Commissioner Gordon, and also a <br /> change which specifies the use of the County seal instead of the Board approved County logo. <br /> ORANGE COUNTY POLICY FOR CRAFTING AND INSTALLING COMMEMORATIVE <br /> PLAQUES FOR COUNTY OWNED BUILDINGS AND FACILITIES <br /> The following policy (and related procedures) shall apply to the crafting and installation <br /> of commemorative plaques honoring County owned facilities. <br /> 1. Facility is defined as: <br /> a. a newly constructed County owned building, park facility, or recreation <br /> facility as outlined in the County Capital Investment Plan; or <br /> b. a major renovation to an existing Facility in excess of$1,000,000 in capital <br /> project funds appropriated by the Board of County Commissioners. <br /> 2. The following commemorative plaque characteristics shall be required: <br /> a. General characteristics for all commemorative plaques: <br /> i. The County seal shall be placed at the top of each inscription. <br /> ii. The plaque will include 1) the name of the project and the date; <br /> 2) the names of the members of the Board of County Commissioners <br /> (BOCC) seated at the time of the completion of the project, plus the <br /> names of any former Commissioners in office at the time the project <br /> was approved; 3) the elected Chair and Vice-Chair designations for <br /> the BOCC seated at the time of the completion of the project; and 4) <br /> the County Manager at the time of the completion of the project; 5) <br /> the Designer of Record for the project; and 6) the General Contractor <br /> for the project. <br />