Browse
Search
Agenda - 03-18-2014 - 6e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 03-18-2014 - Regular Mtg.
>
Agenda - 03-18-2014 - 6e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 11:34:23 AM
Creation date
3/14/2014 11:37:40 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6e
Document Relationships
Minutes 03-18-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />TAC 3/12/2014 Attachment 11A <br />b. Review and approval of a Prospectus for transportation planning which defines <br />work tasks and responsibilities for the various agencies participating in the <br />transportation planning process; <br />c. Review and approval of the transportation Unified Planning Work Program; <br />d. Review and approval of changes to the National Highway System, Functional <br />FQ <br />Classification, and Metropolitan Planning Area boundary; <br />_ Comment [BE24]: Old 1110U includes °urban <br />for the DCHC MPO under the provisions of MAP -21 and any other subsequent <br />— P <br />area boundary". Urbanized area set by Census <br />Transportation Authorizations <br />e. Review and approval of the Comprehensive and Metropolitan Transportation <br />LSmoothed UZA no longer necessary. <br />— Comment [BE32]: Added <br />j. Review and approval of a policy for public involvement forth e DCHC MPO; <br />Plans. As specified in General Statutes Section 136- 66.2(a), the Comprehensive <br />k. Review and approval of an agreement between the MPO, the State, and public <br />Transportation Plan shall include the projects in the Metropolitan Transportation <br />transportation operators serving the Metropolitan Planning Area that defines <br />Plan and may include additional projects that - a - re not in cl_ude_d_ in_t h_e financially- <br />mutual responsibilities for carrying out the metropolitan planning process in <br />comment[BE25]: Changed from "as well as° in <br />accordance with 23 C.F.R. 450.314; <br />- –r <br />constrained plan or are anticipated to be needd beyond the horizon year as as <br />_, <br />response to NCDOT comment <br />required by 23 U.S.C. Section 134. As specified in General Statutes Section 136- <br />66.2(d) revisions to the Comprehensive Transportation Plan arelrequired to be <br />Comment [BE26]: Changed from "may Win <br />jointly approved by the North Carolina Department of Transportation and the <br />response to NCDOT comment. <br />MPO Board; <br />i <br />Comment [BE27]: Updated to reflect current <br />names ofplans and legislation. <br />Review and approval of the Transportation Improvement Program and changes <br />to the Transportation Improvement Program. As specified in 23 U.S.C. Section <br />134(k), all federally funded projects carried out within the boundaries of a <br />metropolitan planning area serving a transportation management area <br />(excluding projects carried out on the National Highway System) shall be <br />selected for implementation from the approved TIP by the metropolitan <br />planning organization designated for the area in consultation with the State and <br />any affected public transportation operator; <br />g. Review and approval of planning procedures for air quality conformity and <br />review and approval of air quality conformity determination for projects, <br />programs, and plans; <br />Comment [BE26]: Added reference to specific <br />language for selection of TIP projects in <br />Transportation Management Areas. <br />Comment [BE29]: Added <br />h. Review and approval of a Congestion Management Process; Comment [BE30]: Added <br />i. Review and approval of the distribution and oversight of federal funds designated <br />for the DCHC MPO under the provisions of MAP -21 and any other subsequent <br />— P <br />Comment [BE31]: Changed from `Durham <br />Transportation Authorizations <br />Urbanized Area" m response to NCDOT comment <br />— Comment [BE32]: Added <br />j. Review and approval of a policy for public involvement forth e DCHC MPO; <br />/ Comment [BE33]: Added <br />k. Review and approval of an agreement between the MPO, the State, and public <br />transportation operators serving the Metropolitan Planning Area that defines <br />mutual responsibilities for carrying out the metropolitan planning process in <br />accordance with 23 C.F.R. 450.314; <br />= Comment [BE34]: Added <br />
The URL can be used to link to this page
Your browser does not support the video tag.