Orange County NC Website
TAC 3/12/2014 Attachment 11A 13 <br />I <br />Failure by member governments to pay the approved share of costs may also result in <br />2 <br />the withholding of MPO services and funding. <br />Comment [BE58]: Added. This paragraph was <br />3 <br />rewritten in response to NCDOT and Orange County <br />comment <br />4 <br />The municipalities and the counties receiving federal transportation funding designated <br />5 <br />for the Durham Urbanized Area as approved by the MPO Board through the Unified <br />6 <br />Planning Work Program shall comply with adopted reporting and oversight procedures. <br />_ <br />Comment[BE59]: Added <br />7 <br />8 <br />North Carolina Department of Transportation <br />9 <br />10 <br />The Department will assist in the transportation planning process by providing planning <br />11 <br />assistance, data, and inventories in accordance with the Prospectus. Should any <br />12 <br />authorized local government body choose to adopt or amend a transportation corridor <br />13 <br />official map for a proposed public transportation corridor pursuant to N.C.G.S. § 136- <br />14 <br />44.50, the Department may offer assistance by providing mapping, data, inventories, or <br />15 <br />other Department resources that could aid the local government body in adopting or <br />16 <br />amending a transportation corridor official map.L <br />— comment[BE6o]: changed <br />1 7 <br />pom <br />Department, to the fullest extent possible ble and nd as <br />permitted by existing state and federal regulations, <br />18 <br />Triangle Transit <br />will provide assistance in the protection ofnecessary <br />19 <br />rights -of -way for those transportation facilities <br />designated in the adopted Metropolitan <br />20 <br />Triangle Transit will assist in the transportation planning process by providing planning <br />Transportation Plan Comprehensive <br />in <br />Transportation Plan" n response to NCD07 <br />21 <br />assistance, data, and inventories in accordance with the Prospectus. Triangle Transit <br />comment. <br />22 <br />may also voluntarily contribute additional funds for other purposes such as to <br />23 <br />participate in funding the costs of special studies, or other specialized services as <br />24 <br />mutually agreed upon.LTriangle Transit shall comply with adopted reporting and <br />Comment [BE61]: Added_ Uses same language <br />25 <br />oversight procedures for the receipt of federal transportation funding designated for <br />as CAMPO <br />26 <br />the Durham Urbanized Area as approved b the MPO Board through the Unified <br />PP y g <br />Commenthangea:Added anon - <br />sthat <br />substantive change as it clarifies that Tnangle <br />27 <br />Planning Work Program. <br />Transit has the same option as the municipalities and <br />28 <br />-- <br />. counties to contribute funding (identical to the <br />sentence on page 9, lines 34 -37) The contribution is <br />29 <br />E- Verify Compliance for All Parties to this Agreement <br />not required, it is optional. <br />30 <br />\ Comment [BE63]: Added <br />31 <br />Each of the parties covenants that if it enters into any subcontracts in order to perform <br />32 <br />any of its obligations under this contract, it shall require that the contractors and their <br />33 <br />subcontractors comply with the requirements of NC Gen. Stat. Article 2 of Chapter <br />34 <br />64. In this E- Verify Compliance section, the words contractors, subcontractors, and <br />35 <br />comply shall have the meanings intended by applicable provisions of NC Gen. Stat. <br />36 <br />Chapters 153A and 160A. <br />- 'Comment[BE64]: Added in response to Ctty of <br />37 <br />Durham comment <br />38 <br />Section III <br />39 <br />40 Parties to this Memorandum of Understanding may terminate their participation in the <br />41 continuing transportation planning process by giving ninety (90) days written notice to th_e__J % Comment[BE65]: Changed from "ihtrty(30)" in <br />response to Carrboro and City of Durham comment <br />42 other parties prior to the date of termination. If any party should terminate participation, this <br />43 Memorandum of Understanding shall remain in force and the Durham - Chapel Hill - Carrboro <br />44 Metropolitan Planning Organization shall continue to operate as long as 75% or more of the <br />10 <br />