Browse
Search
2014-123 Planning - Park Construction of NC Inc for McGowan Sewer Interceptor Construction $597,813
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-123 Planning - Park Construction of NC Inc for McGowan Sewer Interceptor Construction $597,813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 8:42:25 AM
Creation date
3/11/2014 3:06:39 PM
Metadata
Fields
Template:
BOCC
Date
11/5/2013
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5h - Chair signed
Amount
$597,813.00
Document Relationships
2014-409 Planning - Park Construction of NC, Inc. for McGowan Sewer Interceptor Construction Change Order #1 $470,589.95
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2014
Agenda - 11-05-2013 - 5h
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 11-05-2013 - Regular Mtg.
R 2014-123 Planning - Park Construction of NC Inc for McGowan Sewer Interceptor Construction
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . . <br /> Please return this copytotheOerktotheBoand's <br /> -- <br /> ���� <br /> BOND NO. 106008100 r^=�°~~—�f�ceforpernnanentaQenda �|e. <br /> PERFORMANCE Bvmi,4" <br /> Any singular reference 10 Contractor, Surety,Owner, or other party mbuU he considered plural where applicable. <br /> CONTRACTOR(Name andAddress): SURETY(Name. and Address of Principal Place�B���): <br /> PARK CONSTRUCTION OF NORTH TRAVELERS C/\8UALTYAND �URETYCOK8PAN ' OFA&1ER|CA <br /> CAROLINA, INC, 35O GRANITE STREET <br /> PO BOX 500, K4ORR|5V|LLE, NC 27560 BRAINTREE, MA 02184 <br /> OWNER(Name undAudreux): <br /> ORANGE COUNTY <br /> 200 S. CAMERON STREET(P.0, BOX 8181) <br /> H|LLSBORDU8H, NC. 28278 <br /> CONTRACT <br /> {Iffeotb/o Date ofAgreement: <br /> Amount: $597.813.13 <br /> Description (Name onJlocu/ion): K4o6OWAN INTERCEPTOR <br /> BOND <br /> Bond Number: 106088190 <br /> Date (Not earlier than Effective Date of <br /> Agreement): <br /> Amount: $597.81313 <br /> Modifications to this Bond Form: NONE <br /> Surety and Contractor, intending tohe legally bound hereby, subject k/the tcmua set forth below, do each cause <br /> this Performance Bond to be duly executed by an authorized officer, agent, or representative. <br /> CONTRACTOR AS PRINCIPAL 80RIKTY <br /> PARK CONSTRUCTION OF NORTH TRAVELERS CASUALTY AND SURETY COMPANY <br /> CWROL|NA INC, u|) <br /> to <br /> Signature Xigna—ture(Attach Power of Attorney) <br /> KENNETH T. K8ALON80N E. A. MORR|8SETTE <br /> Print Name Print Name <br /> VICE PRESIDENT ATTORNEY-IN-FACT <br /> Tide Ih|� <br /> Attest: - &t�'ut� <br /> S. B. KELLY, <br /> ATTORNEY-|N-FACT ` <br /> /u/o ' /u/e <br /> /&//o: Provide execution 6v additional parties, such oxjobn/venturers, if necessary. <br /> EJcmcc-6m Performance Bond <br /> Prepared ux the Engineers Joint Contract Documents Committee. <br /> Page 1 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.