Browse
Search
Minutes 11-12-2013
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2013
>
Minutes 11-12-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2014 10:38:27 AM
Creation date
3/11/2014 8:12:03 AM
Metadata
Fields
Template:
BOCC
Date
11/12/2014
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 11-12-2013 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 11-12-2013 - Work Session
Agenda - 11-12-2013 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 11-12-2013 - Work Session
Agenda - 11-12-2013 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 11-12-2013 - Work Session
Agenda - 11-12-2013 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 11-12-2013 - Work Session
Agenda - 11-12-2013 - 4
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 11-12-2013 - Work Session
Agenda - 11-12-2013 - 5
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 11-12-2013 - Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Total $1,997,730 <br /> Mothballing of Classroom Wings (photo) <br /> Mothballing <br /> • Objective <br /> — Preservation of Existing Space <br /> • Minimum Scope <br /> — Window Replacement <br /> — Roof Replacement <br /> — HVAC <br /> — Fire Alarm <br /> — Smoke Detection <br /> Mothballing <br /> • Cost <br /> — Additional Cost: $358,700 <br /> • Mothball Cost: $579,900 <br /> • Mothball Design Fees:$28,800 <br /> • Less Deconstruction Budget: ($250,000) <br /> • Benefits <br /> — Preserves 21,000 s.f. for future use <br /> — Replacement Cost: $3-4 Million <br /> — 1,100 s.f. Classroom available as Multi-Media Room in Project <br /> — Preserves Historic Appearance <br /> John Thomas said the charge was the development of the center section of the existing <br /> building, which represents between 11,000 and 13,000 square feet. He said the simultaneous <br /> charge was to look at the effect of mothballing the areas noted in gray on the maps, in case of <br /> a need for future development. <br /> He said the proposal is to keep or mothball all wings of the facility, and convert the <br /> gravel lot to a paved lot, which will not change the impervious surface. He walked through the <br /> proposed site plan blueprint. He said the memorial site out front would put back the old <br /> flagpole along with information about the old school. <br /> John Thomas reviewed the floor plan and said the goal is to create a lobby out of the <br /> current outdoor walkway, and develop the cafeteria into three main spaces — a small group <br /> room, a large group space, and a recreation room. He said the kitchen would be divided into a <br /> church style kitchen with storage and two restrooms - one available to the kitchen and one to <br /> the exterior ball fields. <br /> He said the gym will be converted into a multipurpose room with some recreational <br /> capabilities. He said the old stage will be closed off with folding walls to allow for use as an <br /> exercise space. <br /> Commissioner McKee arrived at 7:18 pm. <br />
The URL can be used to link to this page
Your browser does not support the video tag.