Browse
Search
Agenda - 03-11-2014 - 3 CIP
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 03-11-2014 - Work Session
>
Agenda - 03-11-2014 - 3 CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2015 11:27:47 AM
Creation date
3/10/2014 10:58:17 AM
Metadata
Fields
Template:
BOCC
Date
3/11/2014
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3 CIP
Document Relationships
Minutes 03-11-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• FY15/ 16 Court Addition ($900,000): Completing the major expansion vision would be the addition of a <br />regulation high school/ college basketball court along with retractable bleachers. Additional programming would <br />include youth and adult basketball leagues; Lil Dunkers; court based fitness programs; volleyball, and Kidsplex <br />activities. <br />• Additional revenue from membership growth with these phased in facilities is anticipated to generate <br />$3,597,000 over the FY15 -16 to FY19 -20 five year planning horizon, with an additional $2,430,950 in other <br />program revenue anticipated over the FY15 -16 to FY19 -20 five year planning horizon. <br />Financial Impact: <br />• Although the timing of the project may change, the overall positive financial impact assumptions remain sound. <br />The Lobby renovation assumptions are already being validated through continued growth as membership <br />continuesto grow in anticipation of the improvements. The revenue and expense pro forma has been updated <br />to isolatejust the Mezzanine /Turf /Court portionsof the project. <br />• The land acquisition has been finalized and all parking and traffic flow will be readily accommodated by the <br />ability to design the proposed new building addition on the expanded property site with maximum efficiencies. <br />• An independent study of Orange County entertainment and recreation facilities, as published in the Daily Tar <br />Heel and Chapel Hill News, ranked the Orange County Sportsplex asthe number one recreation/ entertainment <br />destination facility in the County ahead of even the Dean E Smith Center. <br />• The current pace is480,000 annual visitors. Aswell, since this exceptional facility resides within the County, it <br />encourages residentsto stay for their fitness, recreation and entertainment needs. This in turn results in <br />significant dollars staying within the County both in monies spent at the Sportsplex aswell as local restaurants, <br />food and convenience stores, shopping, etc. The planned expansion would add another 20,000 visitors per <br />month for a combined annual visitor base of 720,000. <br />• Major events at the goortsplex such as swim meets, skating competitions, hockey tournaments, and triathlons <br />average 750 participants and twice that number of spectators for each event. These events attract regional and <br />state wide visitors. The Visitor Bureau has estimated the annual impact on the local economy to be at least <br />$2,112,000. Not contemplated in these numbers is the impact of dollars that remain in the County by <br />participants not leaving to go to facilitates outside of Orange County for their daily fitness and recreation needs. <br />This is estimated to be at least $8,448,000 annually. <br />• The addition of indoor turf and courts to the goortsplex will double the number of events for afurther <br />$10,560,000 annual injection/ retention. <br />Condusion <br />• The recent land acquisition next to the Sportsplex creates the opportunity to evaluate alternate construction <br />design utilization of the expanded land footprint. All goortsplex performance and financial milestones to validate <br />this major project continue to be met. There are strong logistical and financial advantages to revising the project <br />plan. There is a highly positive economic impact on Orange County from the goortsplex expansion plan. <br />:Y/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.