Orange County NC Website
Water & Sewer Utilities Capital Projects <br />Fiscal Years 2014 -19 <br />Project Name Buckhom EDD Phase 2 Extension (Efland Sewer to Mebane) Project Status Approved <br />Functional Service Area Community and Environment Starting Date 7/1/2012 <br />Department Planning Completion Date 1213012015 <br />Current <br />Year 1 Year 2 Year 3 Year 4 Year 5 Five <br />Year 6 <br />Prior Years Fiscal Year <br />Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year <br />to <br />Project Budget Funding 2013 -14 <br />2014 -15 2015 -16 2016 -17 2017 -18 2018 -19 Total <br />Year 10 <br />Appropriation <br />Professional Design Services 151,600 - <br />230,000 230,000 <br />Land /Building 40,000 <br />- <br />362,400 <br />Construction /Repairs/Renovations - <br />4,300,000 4,300,000 <br />1,812,000 <br />Equipment/Furnishings <br />1 4,530,000 - - - - 4,530,000 <br />- <br />Total Project Budget 151,600 40,000 <br />General Fund Related Operating Costs <br />Personnel Services <br />Operations <br />New Debt Service <br />Total Operating Costs <br />Revenues/Funding Source <br />Transfer from General Fund 151,600 - <br />Article 46 Sales Tax - Debt Service - <br />Article 46 Sales Tax Proceeds 40,000 <br />Debt Financing - Article 46 Sales Tax 4,530,000 <br />Total <br />Project Description /Justification <br />362,400 <br />362,400 <br />362,400 <br />362,400 <br />1,449,600 <br />1,812,000 <br />362,400 <br />362,400 <br />362,400 <br />362,400 <br />1,449,600 1 <br />1,812,000 <br />362,400 <br />362,400 <br />362,400 <br />362,400 <br />1,449,600 <br />1,812,000 <br />4,530,000 <br />Currently, the wastewater collected by the Efland sewer system is pumped 3 1/2 miles east to the Town of Hillsborough via a 10" force main. This project would <br />construct the infrastructure necessary to send the wastewater collected by the existing system (circa 1988 +), the proposed system extension and any future <br />system extensions the opposite direction to the City of Mebane along West Ten Road. This fits into a long range strategy to ultimately turn over operation of the <br />Efland sewer system to the City of Mebane based on an interlocal agreement signed in 2012. This project would also construct the force main between the <br />existing Gravelly Hill Pump station and Rock Quarry road which will eventually allow the Gravelly Hill PS (Buckhorn EDD) to be upgraded. When completed, the <br />roughly $100,000 annual General Fund contribution necessary to cover the expenses of operating the Efland Sewer System would be eliminated. Cost estimates <br />have been revised based on preliminary design data and recent bid prices on related projects. The original Professional Design Services estimate for 2012 -2013 <br />has been revised to reflect the actual cost of the design contract approved by the BOCC on 9/6/2012. The estimated construction costs and professional <br />services costs have increased due to revised pricing /design that has taken place in the past several months. Note: Design and permits to go under the <br />Interstate and Railroad will more than likely take all of FY 2013 -14 to complete. Some parts of this project, when completed, may shift to the General <br />Fund as the engineering design and scope of the project are defined. <br />72 <br />