Orange County NC Website
Water & Sewer Utilities Capital Projects <br />Fiscal Years 2014 -19 <br />Project Name <br />Buckhorn- Mebane EDD Phase 3 & 4 Water and Sewer <br />Project Status <br />Approved <br />Functional Service Area <br />Engineering <br />- 350,000 350,000 <br />- 200,000 200,000 400,000 <br />- 2,500,000 2,500,000 <br />Starting Date <br />81112015 <br />Department <br />Planning <br />Completion Date <br />1213112017 <br />Current <br />Year 1 Year 2 <br />Year 3 <br />Year 4 Year 5 Five <br />Year 6 <br />Prior Years Fiscal Year <br />Fiscal Year Fiscal Year <br />Fiscal Year <br />Fiscal Year Fiscal Year Year <br />to <br />Project Budget <br />Funding 2013 -14 <br />2014 -15 2015 -16 <br />2016 -17 <br />2017 -18 2018 -19 Total <br />Year 10 <br />Appropriation <br />Professional Design Services <br />- 200,000 <br />120,000 <br />320,000 <br />Land /Building <br />- 150,000 <br />150,000 <br />Construction /Repairs /Renovations <br />- <br />2,380,000 <br />2,380,000 <br />Equipment /Furnishings <br />- 350,000 <br />2,500,000 <br />- - 2,850,000 <br />Total Project Budget - <br />General Fund Related Operating Costs <br />Personnel Services <br />Operations <br />New Debt Service <br />Total Operating Costs <br />Revenues /Funding Source <br />Article 46 Sales Tax Proceeds <br />Article 46 Sales Tax - Debt Service <br />Debt Financing - Article 46 Sales Tax <br />Total <br />Proiect Description /Justification <br />This 350 acre area of the County has been designated an Economic Development District for about two decades, but has not seen the development originally <br />envisioned. This is due in large part to having no water or sewer infrastructure available to support development. Design and ultimately construction of water <br />and sewer infrastructure in this EDD will remove one of the barriers to development in the area. Design of water and sewer infrastructure to serve the Phase 3 & <br />4 will have to await the construction of Phase 2 portion of the Buckhorn- Mebane EDD with anticipated construction in earlier year CIP's. The Phase 2 portion is <br />generally the land that is bounded by Buckhorn Road to the west, the Interstates 40/85 to the south and the railroad or Hwy 70 to the north. This project <br />estimated cost is based on approximately 10,000 feet of gravity sewer which branches off from the Phase 2 infrastructure to serve area D3 and D4 (as shown in <br />the Hobbs Upchurch utilities analysis dated November 2011), two highway bores, and one new sewer pump station to replace the existing Gravelly Hill pump <br />station. <br />71 <br />200,000 200,000 400,000 <br />1 1,000,000 <br />- - - 200,000 200,000 400,000 <br />1,000,000 <br />- 350,000 350,000 <br />- 200,000 200,000 400,000 <br />- 2,500,000 2,500,000 <br />1,000,000 <br />nnn 9 Ann nnn 2nn nnn 2nn nnn s 25n nnn <br />1 1 nnn nnn <br />This 350 acre area of the County has been designated an Economic Development District for about two decades, but has not seen the development originally <br />envisioned. This is due in large part to having no water or sewer infrastructure available to support development. Design and ultimately construction of water <br />and sewer infrastructure in this EDD will remove one of the barriers to development in the area. Design of water and sewer infrastructure to serve the Phase 3 & <br />4 will have to await the construction of Phase 2 portion of the Buckhorn- Mebane EDD with anticipated construction in earlier year CIP's. The Phase 2 portion is <br />generally the land that is bounded by Buckhorn Road to the west, the Interstates 40/85 to the south and the railroad or Hwy 70 to the north. This project <br />estimated cost is based on approximately 10,000 feet of gravity sewer which branches off from the Phase 2 infrastructure to serve area D3 and D4 (as shown in <br />the Hobbs Upchurch utilities analysis dated November 2011), two highway bores, and one new sewer pump station to replace the existing Gravelly Hill pump <br />station. <br />71 <br />