|
ORANGE COUNTY SCHOOLS
<br />UNFUNDED MAJOR PROJECTS
<br />ATTACHMENT 4
<br />ADD INDOOR ATHLETIC PRACTICE FACILITY (PRICE INCLUDES TOTAL PROJECT
<br />COSTS)
<br />$7,500,000
<br />$9,375,000
<br />OHS
<br />REPLACE BUS GARAGE (TOTAL PROJECT COSTS)
<br />$5,625,000
<br />$7,032,000
<br />TRANSPORTATION
<br />ELEMENTARY #8
<br />$22,000,000
<br />$28,000,000
<br />NEW SCHOOL
<br />SUB TOTAL NEW BUILDING CONSTRUCTION
<br />$85,768,125
<br />$106,501,600
<br />ALS: REPLACEMENT HVAC SYSTEM
<br />$3,764,000
<br />$4,608,000
<br />AL STANBACK
<br />CENTRAL: REPLACEMENT HVAC SYSTEM
<br />$910,800
<br />$1,063,200
<br />CENTRAL
<br />CAMERON PARK: REPLACEMENT HVAC SYSTEM
<br />$1,414,600
<br />$1,822,700
<br />CAMERON PARK
<br />CEDAR RIDGE: REPLACEMENT HVAC SYSTEM
<br />$2,199,400
<br />$2,998,700
<br />CEDAR RIDGE
<br />CW STANFORD: BOILER /CHILLER /AIR HANDLERS
<br />$1,120,000
<br />$1,262,000
<br />CW STANFORD
<br />EFLAND ELEMENTARY: REPLACEMENT HVAC SYSTEM
<br />$1,674,100
<br />$2,255,300
<br />EFLAND ELEMENTARY
<br />GRAVELLY HILL: BOILER /CHILLER /DOAS /AIR HANDLER REPLACEMENT
<br />$1,248,000
<br />$1,672,000
<br />GRAVELLY HILL
<br />GRADY BROWN: BOILER /COOLING TOWER /HEAT PUMPS /OUTSIDE AIR SYSTEM
<br />$774,100
<br />$1,041,600
<br />GRADY BROWN
<br />HILLSBOROUGH ELEMENTARY: 4-PIPE HOT /CHILL SYSTEM FOR CAMPUS
<br />$1,400,800
<br />$1,934,000
<br />HILLSBOROUGH EL
<br />NEW HOPE: CHILLER /BOILER /FAN COIL UNITS /OUTSIDE AIR SYSTEM
<br />$1,491,100
<br />$2,002,800
<br />NEW HOPE
<br />OHS: REPLACEMENT HVAC SYSTEMS /BOILER /CHILLER
<br />$6,444,500
<br />$7,893,950
<br />OHS
<br />PATHWAYS: BOILER /CHILLER /ENERGY RECOVERY UNITS
<br />$1,694,500
<br />PATHWAYS ELEM
<br />SUB TOTAL HVAC REPLACEMENT
<br />$30,248,750
<br />11GRAND TOTAL
<br />1 $136,750,350
<br />107
<br />
|