Orange County NC Website
ORANGE COUNTY SCHOOLS <br />UNFUNDED MAJOR PROJECTS <br />ATTACHMENT 4 <br />ADD INDOOR ATHLETIC PRACTICE FACILITY (PRICE INCLUDES TOTAL PROJECT <br />COSTS) <br />$7,500,000 <br />$9,375,000 <br />OHS <br />REPLACE BUS GARAGE (TOTAL PROJECT COSTS) <br />$5,625,000 <br />$7,032,000 <br />TRANSPORTATION <br />ELEMENTARY #8 <br />$22,000,000 <br />$28,000,000 <br />NEW SCHOOL <br />SUB TOTAL NEW BUILDING CONSTRUCTION <br />$85,768,125 <br />$106,501,600 <br />ALS: REPLACEMENT HVAC SYSTEM <br />$3,764,000 <br />$4,608,000 <br />AL STANBACK <br />CENTRAL: REPLACEMENT HVAC SYSTEM <br />$910,800 <br />$1,063,200 <br />CENTRAL <br />CAMERON PARK: REPLACEMENT HVAC SYSTEM <br />$1,414,600 <br />$1,822,700 <br />CAMERON PARK <br />CEDAR RIDGE: REPLACEMENT HVAC SYSTEM <br />$2,199,400 <br />$2,998,700 <br />CEDAR RIDGE <br />CW STANFORD: BOILER /CHILLER /AIR HANDLERS <br />$1,120,000 <br />$1,262,000 <br />CW STANFORD <br />EFLAND ELEMENTARY: REPLACEMENT HVAC SYSTEM <br />$1,674,100 <br />$2,255,300 <br />EFLAND ELEMENTARY <br />GRAVELLY HILL: BOILER /CHILLER /DOAS /AIR HANDLER REPLACEMENT <br />$1,248,000 <br />$1,672,000 <br />GRAVELLY HILL <br />GRADY BROWN: BOILER /COOLING TOWER /HEAT PUMPS /OUTSIDE AIR SYSTEM <br />$774,100 <br />$1,041,600 <br />GRADY BROWN <br />HILLSBOROUGH ELEMENTARY: 4-PIPE HOT /CHILL SYSTEM FOR CAMPUS <br />$1,400,800 <br />$1,934,000 <br />HILLSBOROUGH EL <br />NEW HOPE: CHILLER /BOILER /FAN COIL UNITS /OUTSIDE AIR SYSTEM <br />$1,491,100 <br />$2,002,800 <br />NEW HOPE <br />OHS: REPLACEMENT HVAC SYSTEMS /BOILER /CHILLER <br />$6,444,500 <br />$7,893,950 <br />OHS <br />PATHWAYS: BOILER /CHILLER /ENERGY RECOVERY UNITS <br />$1,694,500 <br />PATHWAYS ELEM <br />SUB TOTAL HVAC REPLACEMENT <br />$30,248,750 <br />11GRAND TOTAL <br />1 $136,750,350 <br />107 <br />