5 <br /> The Water & Sewer section also includes two (2) new projects in Years 1 and 2 that were not <br /> part of the FY 2013-18 CIP. These projects include the following: <br /> Economic Development Infrastructure — this project reflects the FY 2013-14 funding of <br /> infrastructure for the Morinaga Company, which consists of design for the extension of water, <br /> sewer and roadway infrastructure to the site from surrounding existing utility system and <br /> construction of the water and sewer extension. This project is funded by $250,000 from Article <br /> 46 Sales Tax proceeds, and $750,000 in CDBG funds. This new project also includes $50,000 <br /> in Year 1 for EDD zones right-of-way-accesses, and $50,000 in Year 1 for public-private <br /> participation in EDD zones and rural broadband related access. <br /> Economic Development Utility Extension Project(s) — provides funds of $250,000 in Years 1 and <br /> 2 for future economic development projects that are currently being considered, but have not <br /> been finalized. If no project develops in the coming year, which requires utility extension, the <br /> funds would be available for future years as needed. <br /> Solid Waste: <br /> Sanitation - includes funds of $2,428,283 in Year 1 (FY 2014-15) for Solid Waste Convenience <br /> Center (SWCC) improvements at the Eubanks Road site (the cost has increased by <br /> approximately $1.1 million from the current FY 2013-18 CIP due to the movement of the scale <br /> house operations and associated site improvements, extending water and sewer to the site, <br /> additional stormwater structures, purchase of two additional stationary compactors, and a larger <br /> household hazardous waste building). Year 1 also includes $206,944 for the replacement of a <br /> Hook Lift truck; Year 2 includes $495,000 for SWCC improvements at the High Rock Road site; <br /> and Year 3 includes $340,000 for SWCC improvements at the Ferguson Road site. Years 6-10 <br /> includes $212,028 for SWCC improvements at the Bradshaw Quarry site. <br /> Recycling Operations — the current FY 2013-14 includes the purchase of 2 rural curbside trucks <br /> and the purchase of 19,500 urban recycling carts, at a total cost of $1,602,139. Year 1 (FY <br /> 2014-15) provides for the purchase of 7,000 rural carts, as well as the replacement of two <br /> trucks. Year 2 (FY 2015-16) provides for the purchase of 2,000 additional rural carts. <br /> Note: the Solid Waste Management Department has instituted a re-build program for its heavy <br /> pieces of equipment (not trucks) rather than being replaced. Re-building, or overhauling, is <br /> significantly less expensive than replacing with new equipment, thereby extending its life and <br /> reducing costs. Results of this re-build program are reflected in reduced equipment costs <br /> shown in the CIP, when compared to the current CIP. <br /> SportsPlex— includes funding in Year 1 (FY 2014-15) for a Mezzanine addition at the pool area <br /> to include dedicated member change areas and lockers, workout rooms, and a senior/adult <br /> cardio strength center. Year 2 (FY 2015-16) includes funding of $1,900,000 for a new building <br /> addition that would house an indoor turfed field for soccer, lacrosse, senior walking, running, <br /> Kidsplex functions, and youth/adult flag football leagues. A second new building addition <br /> includes funding of $900,000 also in Year 2 for a second new building addition that would <br /> house a regulation sized high school/college basketball court, including bleacher seating, for <br /> youth and adult basketball leagues, court based fitness programs, volleyball, and Kidsplex <br /> activities. Projected revenue from these new projects would generate enough funds to cover <br /> the additional annual debt service needed for these projects. <br />