Orange County NC Website
4 <br /> expansion; and $4.6 million in Years 6-10 for the construction of new artificial turf fields, <br /> parking, restrooms/equipment building, equipment, and stormwater controls. <br /> Lands Legacy Program — includes $2.4 million over a two-year period ($400,000 in Year 1 and <br /> $2,000,000 in Year 2) for continued conservation and protection of the County's most critical <br /> natural and cultural resources. Note: Prior 2001 Bond authorization of $2.4 million lapsed in <br /> 2010, so new financing is recommended in Years 1 and 2. <br /> Millhouse Road Park — The recommended budget for this project reflects a possible Town of <br /> Chapel Hill/County partnership concept for this project. Funds of $100,000 for design, <br /> engineering, and preconstruction costs are recommended in Year 3 (FY 2016-17), with Park <br /> construction funds of $6,400,000, including a soccer field complex, walking trails, and other <br /> amenities, in Year 4 (FY 2017-18). Note: this project has been pushed back two years from <br /> the current CIP to be consistent with the Town's Parks and Recreation Master Plan. <br /> Special Revenue Projects (Article 46 Sales Tax Proceeds) — Highlights <br /> The Special Revenue section includes anticipated revenue from the Article 46 (1/4 cent) Sales <br /> Tax, with 50% of the proceeds for Economic Development initiatives and 50% for Education <br /> (allocated by the ADM count of the two school districts). In FY 2013-14, proceeds are <br /> estimated at $2,732,000, with 1.5% growth assumed in subsequent years. A summary is <br /> provided within the Special Revenue Projects section of the document listing the recommended <br /> uses of these proceeds. <br /> Proprietary Projects — Highlights <br /> Water & Sewer Utilities: <br /> Buckhorn Economic Development District (EDD) — Phase 2 Extension (Efland Sewer to <br /> Mebane) - reflects funds of $4,300,000 in Year 1 (FY 2014-15) for construction of this project; <br /> this represents an increase in previous anticipated costs due to revised estimates for design <br /> and construction; this continues to fit into the long range strategy to ultimately turn over the <br /> operation of the Elfand sewer system to the Town of Mebane. <br /> Hillsborough EDD - reflects funds of $150,000 in Year 1 for design and easement purchase, <br /> and $1,000,000 in year 2 (FY 2015-16) for construction of water and sewer infrastructure in this <br /> EDD. Note: this project has moved up several years due to projected growth and economic <br /> activity in the Hillsborough EDD area. <br /> Eno EDD - includes $1,750,000 in Year 5 (FY 2018-19) for the construction work in this EDD. <br /> Note: based on recent feasibility studies to provide sewer service to this area, this project has <br /> been pushed back several years from the current CIP. <br /> Buckhorn-Mebane EDD Phases 3 and 4 - includes $2,500,000 in Year 3 (FY 2016-17) for the <br /> Buckhorn-Mebane Phases 3 and 4 construction projects. Note: this project has been moved <br /> back one year from the current CIP to allow for the completion of Phase 2 prior to starting <br /> Phases 3 and 4. <br />