Orange County NC Website
r <br /> 2 <br /> During and after the presentation on November 12, the Board provided thoughtful feedback and <br /> guidance to staff and asked for the following additional information with regard to the <br /> Community Center project and the existing classroom wings. After receiving Board feedback <br /> during this work session, staff will schedule a public meeting with the area residents and other <br /> interested persons with regard to programming needs and interests. <br /> 1. Status of bus service and associated parking ("Park & Ride", "Kiss & Ride") at the <br /> Cedar Grove Community Center <br /> Orange County Planning confirms that bus service to the Cedar Grove site is the first service <br /> planned to be launched as part of the 5 year bus service program. The design and installation <br /> of the planned transit shelter and amenities (signage, schedules, etc.) can be coordinated with <br /> the Community Center design should the BOCC choose to move forward with the project. The <br /> BOCC should see the final bus service plan for approval in April 2014. <br /> 2. Cost-Benefit of including the additional classroom upfit and including it within the <br /> Community Center project. <br /> The Board asked for the impact of including the following area previously outside of the scope <br /> of the project as part of the Community Center plan. The cost of the additional upfit for 732 <br /> square feet of multi-functional, programmable space is estimated at $29,000. <br /> FAeilily-. <br /> MEN . va ✓e ti ; Ots <br /> fi57SF <br /> Additional space: <br /> WOWN <br /> 732 square feet as <br /> multi-functional, L-;, ,Ij <br /> programmable M,Ull-Media Rowe <br /> space I f 1,496 SF Is <br /> Estimated cost: <br /> $29.000 <br /> 3. Further cost-benefit analysis of classroom wings. <br /> The Board may recall the "mothball" cost-benefit analysis from the November 12, 2013 work <br /> session. The estimated mothball "base" cost for 21,000 square feet of the classroom wings in <br /> order to protect the space for future use is $608,700. This estimate includes $28,800 for the <br /> design. The scope of the work includes restoring the building envelope systems (roof, windows, <br /> masonry) and providing adequate heating and cooling to preserve the internal areas. The <br /> annual utility cost to maintain this condition is estimated between $3,000 and $6,000. <br /> The Board asked for clarification with regard to the base "mothball' option to be expanded into <br /> a conditioned storage option or a fully programmed space option. Both options would <br /> require the full base "mothball"investment. <br /> Option A — Conditioned Storage. Should the area be upfit for conditioned storage, a more <br /> extensive fire alarm system would need to be installed at an estimated additional cost of <br />