Browse
Search
RES-2013-068 Resolution Endorsing Priority Transportation Projects for the Burlington-Graham MPO Regional Priority List for 2016-2022 Transportation Improvement Program
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
2010-2019
>
2013
>
RES-2013-068 Resolution Endorsing Priority Transportation Projects for the Burlington-Graham MPO Regional Priority List for 2016-2022 Transportation Improvement Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 3:19:53 PM
Creation date
3/3/2014 10:27:08 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2013
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
5i
Document Relationships
Agenda - 09-17-2013 - 5i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 09-17-2013 - Regular Mtg.
Minutes 09-17-2013
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 Mattress Factory Road Interchange: Construct a new interchange at the existing grade- <br /> separated crossing of Mattress Factory Road and 1-40/1-85. <br /> This project was previously submitted by the City of Mebane for prioritization as a Highway <br /> Mobility project and will be submitted by Orange County for reprioritization and consideration <br /> for inclusion the BGMPO MTIP and 2016-2022 STIP. <br /> 3 Mattress Factory Road Extension to U.S. 70: Extend Mattress Factory Road northward across <br /> East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S. <br /> 70 and close the existing railroad crossover road connecting East Washington Street and U.S. <br /> 70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East <br /> Washington Street. <br /> This project will be submitted as a new highway project to be considered for inclusion in the <br /> BGMPO LRTP and MTIP as well as the 2016-2022 STIP. <br /> 4 Park-and-Ride Lot in the Buckhorn Economic Development District (EDD)/Mebane area: <br /> Construct a park-and-ride facility to be located in the Buckhorn EDD/Mebane area to serve a <br /> cross-county bus route from Mebane to Durham to collect ridership in eastern Alamance and <br /> western Orange Counties as indicated in the Orange County Bus and Rail Investment Plan <br /> (OCBRIP). <br /> This project will be submitted as a new transit project for consideration of inclusion in the <br /> BGMPO LRTP and MTIP as well as the 2016-2022 STIP. The project was previously <br /> submitted through the Durham-Chapel Hill-Carrboro (DCHC) MPO as a park-and-ride facility <br /> to be specifically located in the Buckhorn EDD. <br /> 5 Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road <br /> (SR1144) to multiple lanes with bicycle and pedestrian facilities. <br /> This project was previously submitted as a highway project and will be reprioritized and <br /> submitted as a highway project for consideration of inclusion in the BGMPO LRTP and MTIP <br /> as well as the 2016-2022 STIP. <br /> 6 Lebanon Road bicycle and pedestrian improvements: Construct four (4)-foot bicycle lanes <br /> from N. Frazier Road to Stagecoach Road with pedestrian/sidewalk facilities from Saddle Club <br /> Road to Stagecoach Road. <br /> This project will be submitted as a new highway project for consideration of inclusion in the <br /> BGMPO LRTP and MTIP as well as the 2016-2022 STIP. <br /> t, <br /> Upon motion of Commissioner 1,"A`,�l'�--I_ , seconded by Commissioner <br /> the foregoing resolution was ado ted this the 117 th day of September, 2013. <br /> I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO <br /> HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a <br /> meeting held on September 17, 2013, as relates in any way to the adoption of the foregoing and that <br /> said proceedings are recorded in t i' s of said Board. -2 e�i( <br /> WITNESS my hand and the se ti this /) e day of , 20t3- <br /> _ ..� <br /> 17 <br /> 52 <br /> Clerk Co ,e Board of Commissioners <br /> e <br /> �fi <br />
The URL can be used to link to this page
Your browser does not support the video tag.