Orange County NC Website
19 <br /> Exhibit 5 <br /> -Print file(CM+P) <br /> High Cost Areas <br /> 5� <br /> REA3 <br /> — I LOTS <br /> NW'RFTtxI <br /> .OmC+CUztlp .Om Caa 1 <br /> °S <br /> IL T <br /> AREA1 <br /> 5 LOTS ---- <br /> GFMT Tract <br /> l�baramp <br /> 1 <br /> F <br /> '— \•-„yam_ �± � •� ./ E <br /> o x _ R <br /> The 2012 Sewer concept presented by OWASA had a total estimated cost of $5.8 <br /> million that would serve 86 parcels, with an average cost of $67,000 per parcel. The <br /> Proposed Utility District which evolved from the 2012 Sewer concept has an estimated <br /> total cost of $17.6 million. With an expanded service area, the cost of sewer only is <br /> $11.6 million. If the sewer component of the Proposed Utility District is broken out, <br /> sewer would serve 220 sewer parcels, with an average cost of$53,131 per parcel. <br /> 13 <br />